5-27
Assembly
Step
1
(2)
Assembly Procedure
Part Name
Main Assembly 4 Lever-Release J Attachment
Lever-Release J
CCS-tite (M2.5 x 4)
x 1
(Spring-J holding roller)
• Align the U-groove of the Lever-Release J with the shaft inside the
spring, and insert tab A into hole B; then secure the lever with the
screw.
• Attach the Spring-J holding roller to portion C of the Guide frame
assembly B.
CONFIDENTIAL
Summary of Contents for U375 - TM B/W Dot-matrix Printer
Page 2: ...Technical manual TM U375 U375P English 4005791 Copied Date 199 Copied by ...
Page 54: ...2 23 Figure 2 44 Host Interface Circuit and Custor Display Interface Circuit CONFIDENTIAL ...
Page 58: ...2 27 Figure 2 49 Carriage Motor Drive Signal Timing Chart CONFIDENTIAL ...
Page 149: ...6 2 Circuit 1 CONFIDENTIAL ...
Page 150: ...6 3 Circuit 2 CONFIDENTIAL ...
Page 151: ...6 4 Circuit 3 CONFIDENTIAL ...
Page 152: ...6 5 Circuit 4 CONFIDENTIAL ...
Page 153: ...6 6 Circuit 5 CONFIDENTIAL ...
Page 154: ...6 7 Circuit 6 CONFIDENTIAL ...
Page 156: ...6 9 CONFIDENTIAL ...
Page 157: ...6 10 CONFIDENTIAL ...
Page 158: ...6 11 CONFIDENTIAL ...
Page 159: ...6 12 CONFIDENTIAL ...
Page 168: ...7 9 Table 7 5 TM U375P Gate Array Pin Assignment continued CONFIDENTIAL ...
Page 174: ...CONFIDENTIAL ...
Page 175: ...CONFIDENTIAL ...
Page 176: ...7 17 CONFIDENTIAL ...
Page 177: ...7 18 CONFIDENTIAL ...
Page 178: ...7 19 CONFIDENTIAL ...
Page 179: ...7 20 CONFIDENTIAL ...