
Maintenance 7. Joint #4 (Replacing the Reduction Gear Unit)
S5 Rev.5
147
7.2.2 Replacing the Reduction Gear Unit
When replacing the reduction gear unit, the bearings should be replaced together.
Name
Quantity
Note
Maintenance
Parts
Reduction gear unit
1
R13B010036
Grease for reduction gear
Proper quantity SK-1A
R13ZA00330100
Liquid gasket
Proper quantity 1206C
R13B031201
Adhesive
Proper quantity Loctite 242
R13B031701
Bearing
1
6806ZZ
R13B030810
1
6808ZZ*NS7
R13B030809
Material
Wire tie
-
Joint #4
Reduction Gear
Unit
Removal
(1) Pull out the lead line toward the Arm #2 side.
For details, refer to
Maintenance 9.1 Replacing the Cable
Unit
.
(2) Remove the bolts and then remove the
pipe.
GT-SA bolt : 2-M3×12
(3) Remove he bolts and then remove the Joint #4 motor.
GT-SA bolt: : 2-M3×12 (with M3 washer)
(4) Remove the belt from the pulley.
NOTE
Summary of Contents for ProSix S5 Series
Page 1: ...Rev 5 EM133R2483F EPSON ProSix S5 series MANIPULATOR MANUAL ...
Page 2: ...Manipulator manual S5 series Rev 5 ...
Page 10: ...viii S5 Rev 5 ...
Page 16: ......
Page 84: ...Setup Operation 5 Motion Range 70 S5 Rev 5 ...
Page 86: ...S5 Rev 5 72 ...