EPSON AcuLaser M2000D/M2000DN/M2010D/M2010DN
Revision B
DISASSEMBLY AND ASSEMBLY
Main Unit Disassembly/Reassembly
86
Confidential
3. Pull the Transfer Roller Shafts from the bearings, and remove the Transfer Roller.
4. Remove the gear from the Transfer Roller.
When attaching the Transfer Roller, push the release lever to lift its front end, and put
the gear shaft under the front end of the lever.
Lever
Transfer Roller
Gear
Shaft
Gear
Shaft
Transfer Shaft Bearings
Summary of Contents for AcuLaser M2000D
Page 12: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 24: ...Confidential C H A P T E R 2 OPERATINGPRINCIPLES ...
Page 41: ...Confidential C H A P T E R 3 TROUBLESHOOTING ...
Page 74: ...Confidential C H A P T E R 4 DISASSEMBLYANDASSEMBLY ...
Page 149: ...Confidential C H A P T E R 5 ADJUSTMENT ...
Page 159: ...Confidential C H A P T E R 6 MAINTENANCE ...