EPSON AcuLaser C9200N
Revision D
DISASSEMBLY AND ASSEMBLY
Main Unit Disassembly/Reassembly
184
Confidential
Transfer Belt Unit
C H E C K
P O I N T
The Transfer Belt Unit is included in "Transfer Kit" as a service part. Additionally, the
2nd Image Transfer Roller, Ozone filter, and Dust Filter are also included in "Transfer
Kit". Replace them at the same time. Refer to
(Refer to Chapter 6
“MAINTENANCE”) (p331))
After the Transfer Belt Unit has been removed from the Main Unit for other purposes
than replacement, make sure to put it in the shipping plastic sheet whose color is
black, or wrap it in the light shielding cloth and store it in a dark place.
1. Open the Right Door.
2. Remove two Screws [1] and release the Lock of the Transfer Belt Unit [2].
C9
D9
[1]
[2]
4039F2C005DA
3. Hold the both sides and lift it to take out the Transfer Belt Unit [3] a little.
4. Hold the position [4] as shown in the figure above and remove the Transfer Belt [5].
When installing the Transfer Belt Unit, be careful of the following points.
Insert the Transfer Belt with care not to allow its docking gear to be damaged by
hitting it against the rail or associated part.
Do not touch the surface of the Transfer Belt.
[3]
4039F2C006DA
[4]
[5]
[4]
Summary of Contents for Aculaser C9200N
Page 1: ...SERVICE MANUAL A3 Color Laser Printer EPSONAcuLaser C9200N SEPG08001 Confidential ...
Page 11: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 31: ...Confidential C H A P T E R 2 OPERATINGPRINCIPLES ...
Page 96: ...Confidential C H A P T E R 3 TROUBLESHOOTING ...
Page 156: ...Confidential C H A P T E R 4 DISASSEMBLYANDASSEMBLY ...
Page 313: ...Confidential C H A P T E R 5 ADJUSTMENT ...
Page 331: ...Confidential C H A P T E R 6 MAINTENANCE ...