EPSON AcuLaser C9200N
Revision D
DISASSEMBLY AND ASSEMBLY
Main Unit Disassembly/Reassembly
164
Confidential
Front Door
1. Open the Front Door.
2. Remove the Screw [1] each to remove the Right and Left Stoppers [2].
3. Pull out the Right and Left Pins [3] to remove the Front Door [4].
A1
[1]
[4]
[2]
4038F2C038DB
[3]
4038F2C039DA
Transfer Belt Unit
C H E C K
P O I N T
The Transfer Belt Unit is included in "Transfer Kit" as a service part. Additionally, the
2nd Image Transfer Roller, Ozone filter, and Dust Filter are also included in "Transfer
Kit". Replace them at the same time. Refer to
(Refer to Chapter 6
“MAINTENANCE”) (p331))
After the Transfer Belt Unit has been removed from the Main Unit for other purposes
than replacement, make sure to put it in the shipping plastic sheet whose color is
black, or wrap it in the light shielding cloth and store it in a dark place.
1. Open the Right Door.
2. Remove two Screws [1] and release the Lock of the Transfer Belt Unit [2].
B1
[1]
[2]
4039F2C005DA
Summary of Contents for Aculaser C9200N
Page 1: ...SERVICE MANUAL A3 Color Laser Printer EPSONAcuLaser C9200N SEPG08001 Confidential ...
Page 11: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 31: ...Confidential C H A P T E R 2 OPERATINGPRINCIPLES ...
Page 96: ...Confidential C H A P T E R 3 TROUBLESHOOTING ...
Page 156: ...Confidential C H A P T E R 4 DISASSEMBLYANDASSEMBLY ...
Page 313: ...Confidential C H A P T E R 5 ADJUSTMENT ...
Page 331: ...Confidential C H A P T E R 6 MAINTENANCE ...