ENERGIE
Page | 10
The unit should be transported to the final installation site on a wooden
pallet, during transport the heat pump must not be tilted more than 45 (in
either direction).
The recommended tools to transport the equipment while it is still on
the pallet can be: forklift or pallet.
When transporting the unit make sure that you lift it only from the
bottom and always with the unit placed on the pallet. Do not move the
unit without assistance.
1
1
0
0
.
.
R
R
e
e
c
c
e
e
p
p
t
t
i
i
o
o
n
n
c
c
h
h
e
e
c
c
k
k
The unit was tested and inspected by the manufacturer before shipment,
in order to assure quality. Carefully inspect the all components of the
equipment receive, to make sure that the equipment has not been
damaged during transport.
Verify that all parts ordered were received as specified and if the type,
size and voltage of the unit are correct.
Summary of Contents for FF Evi 10
Page 50: ...ENERGIE Page 48 21 4 Central heating cooling and DHW 21 5 DHW...
Page 52: ...ENERGIE Page 50...
Page 53: ...ENERGIE Page 51...
Page 54: ...ENERGIE Page 52...