Luba
MD
GL Collector – Technical manual
Version 1.0-EN-January 2012
© Enerconcept Technologies inc.
22
4.6 Duct Connection
−
Install the duct connection at the beginning of the row. Align with the mounting flange.
Install a neoprene gasket between the two parts
−
Join the two parts with the sliding joint on the four sides.
12
13
12
13
Neoprene strip
13