Maintenance
TOCII CA72TOC
110
Hauser
8
1.
Install the hose at the injection unit.
2.
Check that the hose is correctly
inserted in the magnetic valve 8.
3.
Press the [E] key.
9
The carrier gas valve MV7 (relay #7) is
opened as soon as 85% of the set
temperature is reached.
The system flushes permanently with
carrier gas.
Sample conditioning takes place (strip
chamber) after the furnace is being
heated.
Operation starts automatically.
Step
Display
Description
COMBUSTION PIPE
RE-CONNECT HOSE P2
[E] TO CONFIRM
XXX
XXX
COMBUSTION PIPE
TEMPERATURE
=
°C
IR
=
ppm
Summary of Contents for TOCII CA72TOC
Page 2: ...Endress Hauser...
Page 136: ...TOCII CA72TOC 136 Endress Hauser...
Page 139: ......
Page 140: ......