4.9
Commissioning
Before switching on the measuring system, the following checks should be carried out
again:
•
Check the electrical connections and terminal assignments.
•
Compare the data on the nameplate with the local mains voltage and frequency.
•
Does the direction of the arrow on the nameplate (sensor) agree with the actual
direction of flow in the piping?
If the results of these checks are satisfactory, switch on the supply voltage. The unit is
now ready for operation. After switching on, the system performs various self-test
routines. During this procedure the following sequence of messages appears on the
display:
Display of the communication software version
Promag 33
V2.04.00 HART (
or
RS 485)
Display during start-up
S: START-UP
RUNNING
After successful start-up, normal measurement mode is assumed. The display now
shows the flow rate and the totalizer value simultaneously (“HOME” position):
290.82 m
3
/h
2.1080 m
3
Note!
If start-up is not successful, then an error message is shown indicating the cause.
A list with all error messages is given on page 90 ff.
Note!
4 Electrical Connection
Promag 33
34
Hauser
Summary of Contents for PROMAG 33
Page 43: ...Promag 33 5 Display and Operation Endress Hauser 43...
Page 46: ...5 Display and Operation Promag 33 46 Endress Hauser...
Page 84: ...6 Description of Functions Promag 33 84 Endress Hauser...
Page 98: ...7 Trouble shooting Maintenance and Repairs Promag 33 98 Endress Hauser...
Page 106: ...8 Dimensions Promag 33 106 Endress Hauser...
Page 116: ...9 Technical Data Promag 33 116 Endress Hauser...
Page 125: ......