Installation
Liquiline System CA80TP
18
Hauser
A0028817
10
Securing the base
1. Screw the base to the ground.
2. Have two people lift the analyzer and place it on the base. Use the recessed grips.
3. Screw the base to the analyzer using the 6 screws supplied.
4.4
Mounting the Y strainer (optional)
The Y strainer is designed to directly tap particle-laden samples from pipes. This makes it
possible to determine TP where particles up to a certain size must also be measured.
Mounting materials are not included in the scope of supply and must be provided by the
customer.