Commissioning
Liquiline Control CDC90
60
Hauser
9
Commissioning
9.1
Function check
L
WARNING
Incorrect connection, incorrect supply voltage
Safety risks for staff and device malfunctions!
‣
Check that all connections have been established correctly in accordance with the
wiring diagram.
‣
Ensure that the supply voltage matches the voltage indicated on the nameplate.
NOTICE
Unmonitored activated pumps, valves or similar.
Damage to devices.
‣
Ensure that there is no risk to the measuring system.
Operate the system using only liquids with a conductivity value of > 10 nS/cm.
1. Mount and install the device.
2. Connect the sensor with Memosens technology, which has been precalibrated in the
factor, and immerse it in the medium or buffer.
3. The saved sensor-specific calibration data are automatically transmitted to the
transmitter.
The measured value is displayed.
Normally, you can accept this value without calibrating the sensor. Calibration is
required only in the following cases:
– when very strict accuracy requirements apply.
– when the sensor has been in storage for longer than 3 months.
4. Check the transfer of the measured value to the process control system or the
evaluation unit.
9.2
Filling the canister
‣
Fill the canisters as follows:
Canister (left to
right)
Content
1
Cleaner
2
Buffer 1
3
Buffer 2
We recommend you replace the buffer after a maximum of 6 months.
Summary of Contents for Liquiline Control CDC90
Page 2: ......
Page 118: ...www addresses endress com ...