G3
Series
PROFIBUS
‐
DP
Technical
Manual
Page
9
TDG3PTTM1-2EN
02/09
Subject to change without notice
www.numatics.com/g3
Z-Board™ and Ribbon Cable Example
If fourteen (14) single solenoid and one (1) double solenoid valves are connected directly to the
communication node via their Z-Boards
™
, and one (1) single solenoid and four (4) double solenoid
valves are connected to the communication node via the ribbon cable, the following would be the
valve side bit map:
Output Word
0 1
Output Byte
0
1 2 3
Output Bit No.
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Solenoid Coil
Output No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
n/a
In the above example, Output Bits No. 25 thru No. 31 are allocated but
not used. Allocation may be changed by configuration changes in the
communication module (node). Refer to page 23 in this manual.
NOTE!