FRU Installation
AXP 1410 Installation and Use (6806800H70F
)
74
3. Align the threaded end of the standoff/lockout screw extension with the screw
holes on each side of the shelf and securely tighten to lock the PEM approximately
2 inches out of the shelf.
4. Loosen the PEM ejector handle captive screw and pull the PEM ejector handle to the
full open position.
5. Remove the plastic covering over the terminal block.
6. Verify that the lock and tagout on the branch circuit or power distribution unit is
still intact to ensure the system is in a safe state.
4434 0706
Standoff
Retaining Screw
PEM
4435 070
CB5
H/S
IS
OOS
BOND
POINT
ESD
25
Standoff
Retaining Screw
PEM
Lock the replacement PEM into the slot within 3 minutes to maintain the proper cooling
properties of the shelf.
Personal Damage
If the DC power cables are connected to the branch circuit or power distribution unit, a
qualified service person must confirm that the power to the cables is terminated (off) before
continuing the steps to attach the cables to the PEMs.
Summary of Contents for AXP 1410
Page 12: ...AXP 1410 Installation and Use 6806800H70F 12 List of Tables ...
Page 14: ...AXP 1410 Installation and Use 6806800H70F 14 List of Figures ...
Page 22: ...AXP 1410 Installation and Use 6806800H70F About this Manual 22 About this Manual ...
Page 25: ...System Overview AXP 1410 Installation and Use 6806800H70F 25 Figure 1 2 System Rear View ...
Page 62: ...System Installation AXP 1410 Installation and Use 6806800H70F 62 ...
Page 82: ...FRU Installation AXP 1410 Installation and Use 6806800H70F 82 ...
Page 118: ...Supported IPMI Commands AXP 1410 Installation and Use 6806800H70F 118 ...
Page 164: ...FRU Information and Sensor Data Records AXP 1410 Installation and Use 6806800H70F 164 ...
Page 201: ...Index AXP 1410 Installation and Use 6806800H70F 201 ...
Page 202: ...Index AXP 1410 Installation and Use 6806800H70F 202 ...
Page 203: ......