Chapter 3
AXP 1410 Installation and Use (6806800H70F)
47
System Installation
3.1
Overview
The following sections help you to start up and maintain the system:
3.2
Before Installation
This section provides the following information:
z
Type label location
z
Requirements
z
Tools you will need
3.2.1
Requirements
The power input cables must have a minimum cross section of 21 mm
2
, AWG 4.
Section
Description
Before installation
This section provides information about the requirements, unpacking and
inspecting the delivery and the type label location.
Installation
This section provides information about how to mount the system into a rack
and how to ground the system.
Removal
This section provides information on how to power down the system and
remove it from a rack.
Summary of Contents for AXP 1410
Page 12: ...AXP 1410 Installation and Use 6806800H70F 12 List of Tables ...
Page 14: ...AXP 1410 Installation and Use 6806800H70F 14 List of Figures ...
Page 22: ...AXP 1410 Installation and Use 6806800H70F About this Manual 22 About this Manual ...
Page 25: ...System Overview AXP 1410 Installation and Use 6806800H70F 25 Figure 1 2 System Rear View ...
Page 62: ...System Installation AXP 1410 Installation and Use 6806800H70F 62 ...
Page 82: ...FRU Installation AXP 1410 Installation and Use 6806800H70F 82 ...
Page 118: ...Supported IPMI Commands AXP 1410 Installation and Use 6806800H70F 118 ...
Page 164: ...FRU Information and Sensor Data Records AXP 1410 Installation and Use 6806800H70F 164 ...
Page 201: ...Index AXP 1410 Installation and Use 6806800H70F 201 ...
Page 202: ...Index AXP 1410 Installation and Use 6806800H70F 202 ...
Page 203: ......