CDN2000-06-25
coupling decoupling network
28/54
The Ring Wave coupling is clearly organised as shown in the above photograph. All coupling path are equal
as for the SURGe coupling except the coupling to protective earth. The coupling L to PE must be made as
showed in the figure above (no additional resistor or capacitor in circuit).
The colours of the cables and their plugs, as well as the colours of the sockets of the MIG0603IN tester and
of the CDN-1000 coupling network should agree. The yellow cable should be used for "low" and the red
cable for "high".
The desired coupling must be plugged onto the three-phase coupling network.
To synchronise the Ring Wave onto one of the phase L1 to L3 the surged phase must be connected to the
MIG0603IN rear side EUT-power . Use the black banana cable length 1 m. The neutral and the protective
earth must be connected on the rear side of the testers and the CDN2000 (colour blue and yellow green).
The EFT coupling cable (high-voltage BNC) can remain plugged in during the SURGE test
Caution!
The position of the short circuit bridge must be as showed in the figure above.
5.3.6 EFT coupling set up
The EFT pulses are generally coupled in between the lines and the reference plate. Individual couplings
between the lines are not meaningful, as the EFT pulse is already coupled into all parallel lines for line
lengths of around 1m, via the coupling capacitance between the lines.
The test time can also be shortened considerably. In the new EFT Modification Paper, only this coupling is
recommended.
The EFT part
of TRA is
equipped with
33 nF
EFT coupling network
Interference
Source
Interfered
system
Coax cable to TRA
Summary of Contents for CDN2000-06-25
Page 18: ...CDN2000 06 25 coupling decoupling network 18 54...
Page 22: ...CDN2000 06 25 coupling decoupling network 22 54...
Page 24: ...CDN2000 06 25 coupling decoupling network 24 54...
Page 30: ...CDN2000 06 25 coupling decoupling network 30 54...
Page 36: ...CDN2000 06 25 coupling decoupling network 36 54...
Page 38: ...CDN2000 06 25 coupling decoupling network 38 54...
Page 40: ...CDN2000 06 25 coupling decoupling network 40 54...
Page 46: ...CDN2000 06 25 coupling decoupling network 46 54 V Verification by EMC PARTNER 38...
Page 47: ...CDN2000 06 25 coupling decoupling network 47 54...
Page 49: ...CDN2000 06 25 coupling decoupling network 49 54 13 3 Assembly Instruction to MC Connectors...
Page 50: ...CDN2000 06 25 coupling decoupling network 50 54...
Page 52: ...CDN2000 06 25 coupling decoupling network 52 54...
Page 53: ...CDN2000 06 25 coupling decoupling network 53 54...
Page 54: ...CDN2000 06 25 coupling decoupling network 54 54...