8 What must be done following failed operation
8.1 Service; Repairs
The CDN2000-06-25 is a compact equipment and servicing or repairing the tester can only be carried out by
EMC PARTNER authorised service companies.
8.2 Spare parts list
No spare parts are necessary for the MIG.
8.3 Hints when varistors have been damaged in a CDN
8.3.1 General
1) For correct and repeatable test results the CDN input potentially must be fixed (varistors and filters) as
shown in the drawing attached.
2) The varistor can not be destroyed by a SURGE. The energy of the SURGE generator into the varistor is
limited by the generator, coupling impedance and the decoupling coils 1.8mH
3) The varistor can only be destroyed by too high power line voltage and continuous a.c. current passing
the varistors. Below are the reasons listed, why too high power line voltages can occur across the
varistors:
a) Too high voltage at the input of the CDN e.g. instead of 440V a 690V is connected at the CDN input
b) N is not connected to PE. Continuous voltage > 300V caused by unsymmetrical loads will destroy
varistors between N to PE
c) Unbalanced voltages caused by heavy unsymmetrical EUT loads e.g. 1 phase short circuited,
generate > 300V L to N
d) Unbalanced power supply caused by heavy load equipment (e.g. short circuit on one phase) on
same power supply as the CDN
4) Over 250 CDN from EMCP working fine without any problem over many years.
8.3.2 What can be done after varistors has been destroyed?
When a problem with a standard 480V CDN occurs, please check the following:
1) Measure with a multimeter the power supply voltages (CDN not connected)
a) Lx to L <= 480V rms + 8%
b) Lx to N <= 480V / 1.732 <= 277V rms + 8%
c) L to PE <= 480V / 1.732 <= 277 V rms + 8%
d) N to PE =0V
2) When N to PE shows some volts make a connection between N and PE and either measure the current
in the cable or check whether the cable get warm
3) When the cable is cold (no current) make a connection N to PE at the CDN input with 4 mm banana
plugged cable
4) Replace the varistors. Varistors sets can be ordered from EMCP reps.
5) For correct test set-up see user manual of the used CDN
6) Connect always first the PE, second N, last the L
7) For further analysis please send the following information to EMCP PARTNER: Generator setting and
test sequence any load information.
More information can be found in the attached drawing page 2 and in the user manual
Summary of Contents for CDN2000-06-25
Page 18: ...CDN2000 06 25 coupling decoupling network 18 54...
Page 22: ...CDN2000 06 25 coupling decoupling network 22 54...
Page 24: ...CDN2000 06 25 coupling decoupling network 24 54...
Page 30: ...CDN2000 06 25 coupling decoupling network 30 54...
Page 36: ...CDN2000 06 25 coupling decoupling network 36 54...
Page 38: ...CDN2000 06 25 coupling decoupling network 38 54...
Page 40: ...CDN2000 06 25 coupling decoupling network 40 54...
Page 46: ...CDN2000 06 25 coupling decoupling network 46 54 V Verification by EMC PARTNER 38...
Page 47: ...CDN2000 06 25 coupling decoupling network 47 54...
Page 49: ...CDN2000 06 25 coupling decoupling network 49 54 13 3 Assembly Instruction to MC Connectors...
Page 50: ...CDN2000 06 25 coupling decoupling network 50 54...
Page 52: ...CDN2000 06 25 coupling decoupling network 52 54...
Page 53: ...CDN2000 06 25 coupling decoupling network 53 54...
Page 54: ...CDN2000 06 25 coupling decoupling network 54 54...