E-CDN2000-06-25-E-Manual
31/54
6 Testing with the CDN2000-06-25
6.1 Quickstart of TRA or MIG together with CDN2000-06-25
For MIG operation refer to the MIG manual and for TRA operation refer to TRA manual section "Quickstart".
All connection must made as described in chapter 5 at the rear and the front panel of the CDN.
6.1.1 MIG0603Inx Operation with CDN2000-06-25
Before starting a test, the generator must be configured as follows:
Select test voltage
Select number of pulses = total number of pulses
for ALL coupling paths.
Select CDN-3phase from the menu.
The coupling path is not relevant, as switching
must be undertaken manually by the operator on the
CDN2000-06-25 front panel
Ensure the PWR button is NOT enabled (light extinguished).
Summary of Contents for CDN2000-06-25
Page 18: ...CDN2000 06 25 coupling decoupling network 18 54...
Page 22: ...CDN2000 06 25 coupling decoupling network 22 54...
Page 24: ...CDN2000 06 25 coupling decoupling network 24 54...
Page 30: ...CDN2000 06 25 coupling decoupling network 30 54...
Page 36: ...CDN2000 06 25 coupling decoupling network 36 54...
Page 38: ...CDN2000 06 25 coupling decoupling network 38 54...
Page 40: ...CDN2000 06 25 coupling decoupling network 40 54...
Page 46: ...CDN2000 06 25 coupling decoupling network 46 54 V Verification by EMC PARTNER 38...
Page 47: ...CDN2000 06 25 coupling decoupling network 47 54...
Page 49: ...CDN2000 06 25 coupling decoupling network 49 54 13 3 Assembly Instruction to MC Connectors...
Page 50: ...CDN2000 06 25 coupling decoupling network 50 54...
Page 52: ...CDN2000 06 25 coupling decoupling network 52 54...
Page 53: ...CDN2000 06 25 coupling decoupling network 53 54...
Page 54: ...CDN2000 06 25 coupling decoupling network 54 54...