Initial operation
22
BA/Elmaflame/GB/1107
© Elma GmbH & Co KG
6 Initial
operation
6.1
Switch on the unit
Switch on the Elmaflame unit at the mains switch on the back of
the unit (
see illustration 4.7
.).
Switch on the mains
switch
When the unit is switched on at the mains switch, it is
automatically put into „stand-by operating mode“.
The display is now activated and shows the following indication:
Elmaflame
6.2
Switch on the operating mode
Switch the unit into operating mode by pressing the
on/off
key
Switch the unit into
operating mode
at the operating panel for a short period.
The gas reactor is now switched on. The blue LED for lighting
the vapourizer liquid is activated (
illustration 4.6.H.
) and the
display is lighted.
6.3 Leack
check
The programme offers to carry out a leak check. You are asked
to decide if you wish to have an automatic leak check carried
out. We recommend to carry out the leak check on a daily
basis.
Leak check
The leak check can only be carried out with cold electrolyte
reactor (below 45°C).
Check for leaks?
No
Yes
Confirm the request with the key
(Yes) at the operating
panel.
You are now asked to check and confirm that the valve at the
burner hand piece and the filling ducts at the reactor and the
vapourizer glass are shut.
Shut the valve at the
burner hand piece
and shut the reactor
closing caps
Close the burner valve!
Confirm with the key
(
OK
) at the operating panel.
The Elmaflame unit now starts carrying out an automatic leak
check. Please wait until the display indicates the result of the
leak check. This takes approx. 25 to 30 seconds!
Summary of Contents for Elmaflame 140
Page 42: ......