Preparatory measures for initial operation
14
BA/Elmaflame/GB/1107
© Elma GmbH & Co KG
5
Preparatory measures for initial operation
5.1
Unpacking and placement of unit
The unit is shipped in a suitable packing. Check the Elmaflame
unit for possible transport damages before initial operation. In
case of visible damages do not operate the unit and contact
your supplier and the forwarding agent immediately.
Check for transport
damages
If possible, keep the original transport packing in store for
possible later shipment for maintenance or repair purposes.
Or dispose of the packing material according to the relevant
local regulations on waste disposal. You can also return the
packing material to the manufacturer for disposal (shipment
charges to be paid by the customer).
Packing
The unit must be operated under permanent supervision only.
Choice of workplace
The workplace must allow free access to the unit. The operator
must be able to supervise the unit at all times. Possible warning
signals of the unit must be audible/visible.
For operation, place the unit on a dry and solid surface. Ensure
that the workplace is sufficiently ventilated! The cooling air must
circulate through the cooling openings on both sides of the unit.
Placement
Risk of electrocution due to humidity inside the unit!
Protect the unit from entering humidity!
Keep workplace and housing dry in order to prevent electrical
accidents and damages from the unit.
WARNING
Ambient conditions
•
Allowed ambient temperature during operation:
+5°C up to +40°C
•
Allowed relative humidity of air during operation: max. 80 %
•
Indoor operation only (no operation in the open)
•
Protect the unit from direct or indirect heat sources (e.g.
heating elements, direct sunlight) to avoid overheating.
Summary of Contents for Elmaflame 140
Page 42: ......