
Platform Safety EEC-0061
V1.1
Platform Safety
device) that is securely attached to the platform or booms tip, while over land and
detached while over water.
C.
A boat with rescue personnel shall be available during a personnel lift over water.
D.
Special personnel protective equipment shall be provided and required to be worn
around toxic, flammable or hazardous materials or fumes.
Pre-Lift Requirements and Planning
Special procedures are to be followed when it is determined that personnel need to
be lifted in a platform to perform needed work or gain access to certain areas.
A.
The person specifically responsible for the work to be performed shall determine that
there is no other practical method of performing the required work. This person can
authorize the use of personnel lifting. Additionally, this person must evaluate the
safety issues associated with the proposed personnel lift and verify the platform and
hoisting are suitable for use.
B.
For each personnel-lifting event, the person responsible for the work shall issue a
statement describing the procedure to be used. This statement is to be retained at
the jobsite.
C.
Crane and personnel platform shall be inspected daily prior to any lifting events. An
inspection record is to be maintained.
D.
Personnel lifting activities shall be made under controlled conditions with the aid of
an appointed signalperson.
E.
A pre-lift meeting shall be held daily to plan and review personnel lifting procedures.
This meeting is to be attended by the crane operator, signalperson, platform
occupants, and person responsible for the work to be performed. The person
responsible for the work to be performed shall instruct the personnel who will occupy
the platform during the lifting procedure. Instructions are to include procedures for
entering and exiting the platform and when the personnel can enter or exit the
platform.
Summary of Contents for Digger Derrick
Page 2: ......
Page 37: ...Nomenclature EEC 0169 V1 0 Nomenclature...
Page 39: ...Platform Safety EEC 0061 V1 1 Platform Safety...
Page 54: ...Platform Safety EEC 0061 V1 1 Platform Safety...
Page 116: ...Jib Operation EEC 0044 V1 1 Jib Operation E C B A C2 C1 B...
Page 161: ...Digger Derrick Labels EEC 0171 V1 0 Digger Derrick Labels...
Page 163: ...Digger Derrick Labels EEC 0171 V1 0 Digger Derrick Labels 12 20 22 23 24 28 29...
Page 164: ...Digger Derrick Labels EEC 0171 V1 0 Digger Derrick Labels 30 38 39...
Page 170: ...Digger Derrick Specs EEC 0170 V1 2 Digger Derrick Specifications...
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ......
Page 179: ...3 2 1 4 6 5 3 2 1 4 6 5 3 2 1 4 6 5 TITLE...
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 193: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 199: ...Four Section Boom Operation common EEC 0021 V1 3 Four Section Boom Operation...
Page 227: ...4 HYDRAULIC SCHEMATIC...
Page 240: ...17 EXPLODED ISOMETRIC ASSEMBLY DRAWING...
Page 245: ...4 5200S...
Page 246: ...5 6000S...
Page 247: ...Elliott Operating Manual...
Page 277: ...Elliott Calibration and Troubleshooting Manual...
Page 312: ...36 W450321A 09 12...
Page 362: ......
Page 375: ...Appendix B Parts Index ELLIOTT Built for You Digger Derrick Truck B 1...