
Jib Operation EEC-0044
V1.1
Jib Operation
their proper locations. Failure to properly secure the jib during stowing and
erecting may allow the jib to fall. Serious personal injury or death could result.
Always have at least one, if not both of the following in place at all times:
Side stow bracket completely engaged into stow hook with stow pin ‘A’ properly
in place.
Both pins ‘C1’ in upper and lower jib holes properly in place through
mating holes in boom tip.
Jib Maintenance
A.
Lubricate sheave pin on jib with grease gun containing chassis grease weekly.
B.
Check for free rotation of jib sheave daily when using jib.
C.
Lubricate jib sheave case pivot pin with grease gun containing chassis grease
monthly.
Jib removal
Should jib removal from the boom become necessary, proceed as follows:
A.
Unstow and swing jib into position on the boom tip according to steps 1-10 in the
preceding jib deployment section.
B.
Support and raise the jib at its balance point and remove the two swing around
pins. Jib is now free of boom.
C.
To install, proceed in reverse order of removal.
Summary of Contents for Digger Derrick
Page 2: ......
Page 37: ...Nomenclature EEC 0169 V1 0 Nomenclature...
Page 39: ...Platform Safety EEC 0061 V1 1 Platform Safety...
Page 54: ...Platform Safety EEC 0061 V1 1 Platform Safety...
Page 116: ...Jib Operation EEC 0044 V1 1 Jib Operation E C B A C2 C1 B...
Page 161: ...Digger Derrick Labels EEC 0171 V1 0 Digger Derrick Labels...
Page 163: ...Digger Derrick Labels EEC 0171 V1 0 Digger Derrick Labels 12 20 22 23 24 28 29...
Page 164: ...Digger Derrick Labels EEC 0171 V1 0 Digger Derrick Labels 30 38 39...
Page 170: ...Digger Derrick Specs EEC 0170 V1 2 Digger Derrick Specifications...
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ......
Page 179: ...3 2 1 4 6 5 3 2 1 4 6 5 3 2 1 4 6 5 TITLE...
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 193: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Page 199: ...Four Section Boom Operation common EEC 0021 V1 3 Four Section Boom Operation...
Page 227: ...4 HYDRAULIC SCHEMATIC...
Page 240: ...17 EXPLODED ISOMETRIC ASSEMBLY DRAWING...
Page 245: ...4 5200S...
Page 246: ...5 6000S...
Page 247: ...Elliott Operating Manual...
Page 277: ...Elliott Calibration and Troubleshooting Manual...
Page 312: ...36 W450321A 09 12...
Page 362: ......
Page 375: ...Appendix B Parts Index ELLIOTT Built for You Digger Derrick Truck B 1...