© 27.04.2005 ELKA-Torantriebe GmbH u. Co. Betriebs KG                     Page 10  

                                   EST 4004K 

 

Photo-cell testing before gate movement 

 

DIP B6 OFF 

Photo-cell test is not activated. 

DIP B6 ON        A photo-cell test occurs before each moving. 

  

Attention: 

The photo-cell test has to be learnt when programming the controller. Before the 

moving of the gate, the photo-cells may be tested. 

 

 

Max. 6 photo-cells can be connected to the controller MO44-2 and be tested. For the testing 

 

 

of more than one photo-cell the relay connections of the receivers have to be connected in 

 

 

series. Parallel to the relay connections a resistor of 1kOhm (+/- 5%) each has to be  

  connected.

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 
 
 
 
 
 

 

 

 
 
 

 

The photo-cell test consists of two parts: The transmitter is taken off the power supply and 
then the receiver has to report an obstacle (within max. 2.5 seconds). 
The transmitter is connected to the power supply again and then the receiver has to report 
that no obstacle is present. If during part one the receiver does not report an obstacle, the 
photo-cell is faulty. If during part two the obstacle is still being reported (the controller 
assumes a real obstacle being present), the gate will not move. No error code is shown. 

 

 

Summary of Contents for EST 4004K

Page 1: ...ST 4004K Contents Page 1 Usage 2 2 Technical data 2 3 Measurements 2 4 Installation 3 4 1 Emergency release 4 5 Electrical connections 4 6 Connection example 5 7 MO 44 2 Controller 6 7 1 Connections 7...

Page 2: ...ply 400 Vac 50 Hz Power consumption 2 2 kW Control box MO44 2 Electronic brake no The MO 44 2 control box has among others the following characteristics Safety Four separate reactions to the photo cel...

Page 3: ...on parallel to the gate at a distance of 60 mm Mark the middle of each hole on the foundation e Fix the opener either with plugs and screws M20 or with heavy duty tie bolts e Decide at what height the...

Page 4: ...ose the gate and push the holding plate with magnet along the rack until the LED SEZ turns off Fix the holder at this point on the rack so that the magnet passes the housing at a distance of about 10...

Page 5: ...27 04 2005 ELKA Torantriebe GmbH u Co Betriebs KG Page 5 EST 4004K 6 Connection example...

Page 6: ...27 04 2005 ELKA Torantriebe GmbH u Co Betriebs KG Page 6 EST 4004K 2T1 1L1 1L1 2T1 14NO 6T3 4T2 A2 13NO 5L3 3L2 K2 A1 6T3 4T2 14NO A2 5L3 3L2 K1 13NO A1 loop BA1 STOP START 7 MO 44 2 Controller...

Page 7: ...itted to terminal EXT AUF The LED BA lights if BA1 or the corresponding remote button is pressed A permanent open signal is possible BA2 Button to open the gate n o the signal is valid only for this c...

Page 8: ...tputs 300 mA LS TST Power supply for transmitter The controller switches the 24 Vdc on terminal LS TST off 7 2 Operating mode Motor power Changes only take effect if the running time is then learned a...

Page 9: ...when the gate is open The gate reopens if BT is pressed during closing Warning prior to opening DIP B1 OFF No warning DIP B1 ON The warning light is switched on 4 seconds before the gate opens Warnin...

Page 10: ...e relay connections of the receivers have to be connected in series Parallel to the relay connections a resistor of 1kOhm 5 each has to be connected The photo cell test consists of two parts The trans...

Page 11: ...N until the LED DIAG lights approx 3 seconds Press LERN twice The gate closes from any position opens completely and closes again The time required and the power selected DIP A1 and DIP A2 are then sa...

Page 12: ...The LED DIAG stays on as long as a signal is received Release the button The code is stored and the controller is ready for use 8 Timer card optional The 7 day timer can switch between day and night...

Page 13: ...DIAG 11 flashes The controller has detected a fault in the redundant detection of BS stop contact The controller is faulty DIAG 12 flashes The controller detects that the TRIAC or one of motor relays...

Page 14: ...e GmbH Co Betriebs KG accepts no liability for damage which is caused by using the appliance for purposes other than those for which it is built ELKA Torantriebe GmbH Co Betriebs KG cannot recognise e...

Reviews: