A Alloy base
Having assembled the base as previously described on pages 6 and 7, place the greenhouse on top
of the upper base flange, i.e. smaller of the two flanges, position the greenhouse so that the back
vertical edge of the cill is level with the vertical side of the base. Because our base is assembled by
using bolt slots, it is not too difficult to adjust the overall length and width of the base by loosening
the nuts holding the corners and moving the wall of the base slightly in or out to line up the precise
position of the greenhouse. Having arrived at this position you need to drill through the cill and the
upper flange of the base. Between each vertical glazing bar, drill 7mm holes, 20mm in from the
corner of the cill/angle, put holes in the cill in the centre between the vertical glazing bars, insert a
bolt from the top and put a nut on from the underside, tighten all nuts. (
Key point
).
Summary of Contents for KENSINGTON 10 x 6
Page 1: ......
Page 2: ......
Page 3: ......
Page 17: ...DOOR FRAME...
Page 36: ...6 WIDE LT TOUGHENED GLASS PLAN Glass pane for standard door on gable end Louvre on rear end...
Page 39: ...OPTIONAL EXTRAS RAIN WATER KIT FOR GUTTERING...
Page 40: ...ELITE 1407...