ROOF VENT ASSEMBLY
The roof vent pack has 5 pieces of aluminium: and from the main box of fittings you require 6’ of
glazing beading, 4 nuts and bolts, 2 casement stay pins, 1 casement stay and 6 M4 stainless steel
nuts and bolts.
PROCEDURE:
1. Identify the slam bar and attach the 2 stay pins to the outer side of the angles using the M4 stain-
less steel nuts and bolts. Do not fit the slam bar at this stage, see page 26 regarding its installation
and fitting.
2. Lay the 4 edge pieces of the vent on a level surface as though you were on the inside of the event
(with the bolt slots of the side bars uppermost and the ‘V’ slots of the bottom rail uppermost. The
top rail is arranged in such a way that the squared off end is to the bottom and the hooked hinge up-
permost).
3. Slide the glazing beading into the slots in the side and top rails and trim to suit.
4.
Insert a bolt into each end of the side rail bolt slots, put these bolts through the holes in the top
and bottom rails, add nuts and lightly tighten. Check that all joints are secure and that the vent is
square, then tighten up the nuts.
5. Fit the casement stay using the M4 stainless steel nuts and bolts, putting the bolts through the
holes in the saddle of the stay and through the 2 elongated holes in the bottom rail. Hold the nuts in
place and tighten the bolts with a screwdriver.
Do the same with the other vents.
Summary of Contents for KENSINGTON 10 x 6
Page 1: ......
Page 2: ......
Page 3: ......
Page 17: ...DOOR FRAME...
Page 36: ...6 WIDE LT TOUGHENED GLASS PLAN Glass pane for standard door on gable end Louvre on rear end...
Page 39: ...OPTIONAL EXTRAS RAIN WATER KIT FOR GUTTERING...
Page 40: ...ELITE 1407...