
50
SCREEN INSTALLATION
Element4 Gas Fireplaces
European
Home
.com
Once the top tab is installed, place the bottom of the
side short screen into place, with the bottom tab of
the screen placed between the trim and the flange.
Tilt the screen towards the top of the unit until the
tab catches the screen and holds it into place, circled
in the photo on the left.
Once installed properly the screen should look like
the photo to the left.
If needed, slide the screen gently left or right until
the edges of the screen touch.