![Electro Industries Nexus 1262 Installation & Operation Manual Download Page 81](http://html.mh-extra.com/html/electro-industries/nexus-1262/nexus-1262_installation-and-operation-manual_2379711081.webp)
+
Doc #: E1
51
70
1
Electro Industries/GaugeTech
Internal
Battery
Fig.
6
.5: Nexus
®
127
2
Meter
without Internal Shroud
6
-5
CAUTION - BATTERY INSTALLATION OR REPLACEMENT MUST BE DONE WITH POWER OFF!
The Internal Battery is a
3V Lithium Battery
(Panasonic BR2032 or equivalent) that maintains NVRAM and time
during outages. It is located on one of the vertical panels inside the Internal Shroud (see Fig.
6
.5 above). Under
normal conditions, the battery should provide in excess of 10 years of service during storage conditions (disconnected
from terminals) or when properly installed in an energized meter. The battery should provide more than one year of
service during outage conditions (time on battery backup). A LOW BATTERY indicator on the display screen will
tell you when replacement is needed. Installation steps:
1. If you are replacing a battery,
download all memory files
to your computer. Data may be lost.
2. Remove power from the meter.
3. Remove the external meter cover and the internal shroud.
4. Remove the old battery with a screwdriver or similar tool.
5. Place the new battery in the battery holder according to the directions in
Section
6
.2.1
below.
Make sure you place the
+
facing up.
6. Replace the internal shroud and the external meter cover.
7. Energize the meter.
8.
Reset Time
using Communicator software. If IRIG-B is connected, time is synchronized automatic
al
ly.
6.
2: Internal Battery Installation and Maintenance
Summary of Contents for Nexus 1262
Page 1: ... The Leader in Power Monitoring and Control The Leader in Power Monitoring and Control ...
Page 2: ......
Page 4: ...Electro Industries GaugeTech Doc E151701 ...
Page 8: ...e Electro Industries GaugeTech Doc E151701 iv ...
Page 52: ...e Electro Industries GaugeTech Doc E151701 4 8 ...
Page 130: ...Electro Industries GaugeTech Doc E151701 10 14 ...
Page 133: ...Electro Industries GaugeTech Doc E151701 11 3 Fig 11 1 Form 9S Wye no PTs 3 CTs ...
Page 134: ...Fig 11 2 Form 9S Wye 3 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 4 ...
Page 135: ...Electro Industries GaugeTech Doc E151701 11 5 Fig 11 3 Form 9S 4 Wire Delta no PTs 3 CTs ...
Page 136: ...Fig 11 4 Form 9S 4 Wire Delta 3 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 6 ...
Page 139: ...Fig 11 7 Form 9S 3 Wire Delta no PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 9 ...
Page 140: ...Fig 11 8 Form 9S 3 Wire Delta 2 PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 10 ...
Page 141: ...Fig 11 9 Form 36S 2 5 Element Wye no PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 11 ...
Page 142: ...Fig 11 10 Form 36S 2 5 Element Wye 2 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 12 ...
Page 143: ...Fig 11 11 Form 45S Wye no PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 13 ...
Page 144: ...Fig 11 12 Form 45S Wye 2 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 14 ...
Page 145: ...Fig 11 13 Form 45S 3 Wire Delta no PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 15 ...
Page 146: ...Fig 11 14 Form 45S 3 Wire Delta 2 PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 16 ...
Page 150: ...Electro Industries GaugeTech Doc E151701 11 20 ...
Page 154: ...Electro Industries GaugeTech Doc E151701 12 4 Fig 12 5 Switchboard Meter Side View ...
Page 168: ...Electro Industries GaugeTech Doc E151701 12 18 ...
Page 176: ...Electro Industries GaugeTech Doc E151701 13 8 ...
Page 186: ...Electro Industries GaugeTech Doc E151701 A 2 ...
Page 187: ...Electro Industries GaugeTech Doc E151701 A 3 ...
Page 188: ...Electro Industries GaugeTech Doc E151701 A 4 ...
Page 189: ...Electro Industries GaugeTech Doc E151701 A 5 ...
Page 190: ...Electro Industries GaugeTech Doc E151701 A 6 ...
Page 206: ...Electro Industries GaugeTech Doc E151701 C 14 ...