![Electro Industries Nexus 1262 Installation & Operation Manual Download Page 155](http://html.mh-extra.com/html/electro-industries/nexus-1262/nexus-1262_installation-and-operation-manual_2379711155.webp)
Electro Industries/GaugeTech
Doc # E151701
12-5
NOTE:
When the Switchboard cases are built, they are not exact. They are welded together and have
slight variations. For that reason we add Tolerance to the above Cutout Diagram (Fig. 12.6).
The dimensions shown are the exact measurements of boxes we have on hand that have been
measured. We added 1/16 “ (+1.5875mm) for the cutout.
Please check DRILL HOLES for the mounting screw you are using. Check to see that the
mounting screw fits the box tightly enough to hold the box in place. You can use a washer for
a slightly smaller mounting screw.
Fig. 12.6: Switchboard Meter Cutout with Tolerance
∅
∅
Summary of Contents for Nexus 1262
Page 1: ... The Leader in Power Monitoring and Control The Leader in Power Monitoring and Control ...
Page 2: ......
Page 4: ...Electro Industries GaugeTech Doc E151701 ...
Page 8: ...e Electro Industries GaugeTech Doc E151701 iv ...
Page 52: ...e Electro Industries GaugeTech Doc E151701 4 8 ...
Page 130: ...Electro Industries GaugeTech Doc E151701 10 14 ...
Page 133: ...Electro Industries GaugeTech Doc E151701 11 3 Fig 11 1 Form 9S Wye no PTs 3 CTs ...
Page 134: ...Fig 11 2 Form 9S Wye 3 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 4 ...
Page 135: ...Electro Industries GaugeTech Doc E151701 11 5 Fig 11 3 Form 9S 4 Wire Delta no PTs 3 CTs ...
Page 136: ...Fig 11 4 Form 9S 4 Wire Delta 3 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 6 ...
Page 139: ...Fig 11 7 Form 9S 3 Wire Delta no PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 9 ...
Page 140: ...Fig 11 8 Form 9S 3 Wire Delta 2 PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 10 ...
Page 141: ...Fig 11 9 Form 36S 2 5 Element Wye no PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 11 ...
Page 142: ...Fig 11 10 Form 36S 2 5 Element Wye 2 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 12 ...
Page 143: ...Fig 11 11 Form 45S Wye no PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 13 ...
Page 144: ...Fig 11 12 Form 45S Wye 2 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 14 ...
Page 145: ...Fig 11 13 Form 45S 3 Wire Delta no PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 15 ...
Page 146: ...Fig 11 14 Form 45S 3 Wire Delta 2 PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 16 ...
Page 150: ...Electro Industries GaugeTech Doc E151701 11 20 ...
Page 154: ...Electro Industries GaugeTech Doc E151701 12 4 Fig 12 5 Switchboard Meter Side View ...
Page 168: ...Electro Industries GaugeTech Doc E151701 12 18 ...
Page 176: ...Electro Industries GaugeTech Doc E151701 13 8 ...
Page 186: ...Electro Industries GaugeTech Doc E151701 A 2 ...
Page 187: ...Electro Industries GaugeTech Doc E151701 A 3 ...
Page 188: ...Electro Industries GaugeTech Doc E151701 A 4 ...
Page 189: ...Electro Industries GaugeTech Doc E151701 A 5 ...
Page 190: ...Electro Industries GaugeTech Doc E151701 A 6 ...
Page 206: ...Electro Industries GaugeTech Doc E151701 C 14 ...