![Electro Industries Nexus 1262 Installation & Operation Manual Download Page 101](http://html.mh-extra.com/html/electro-industries/nexus-1262/nexus-1262_installation-and-operation-manual_2379711101.webp)
•
Maximum Quadrant 1 Total PF
•
Minimum Quadrant 1 Total PF
•
Maximum Quadrant 2 Total PF
•
Minimum Quadrant 2 Total PF
•
Maximum Quadrant 3 Total PF
•
Minimum Quadrant 3 Total PF
•
Maximum Quadrant 4 Total PF
•
Minimum Quadrant 4 Total PF
Q
Group 6: Delivered Energy
(Use the LEFT/RIGHT arrows to access the following readings, in
order.)
•
+kWatthr Quadrant 1+Quadrant 4 (Primary)
•
+kVAhr Quadrant 1 (Primary)
•
+kVARhr Quadrant 1 (Primary)
•
+kVAhr Quadrant 4 (Primary)
•
-kVARhr Quadrant 4 (Primary)
Q
Group 7: Received Energy
(Use the LEFT/RIGHT arrows to access the following readings, in
order.)
•
-kWatthr Quadrant 2+Quadrant 3 (Primary)
•
+kVAhr Quadrant 2 (Primary)
•
+kVARhr Quadrant 2 (Primary)
•
+kVAhr Quadrant 3 (Primary)
•
-kVARhr Quadrant 3 (Primary)
Q
Group 8: Accumulations
(Use the LEFT/RIGHT arrows to access the following readings, in order.)
•
kI
2
t A
•
kI
2
t B
•
kI
2
t C
•
kV
2
t A
•
kV
2
t B
•
kV
2
t C
Q
Group 9: Phase Angles
(Use the LEFT/RIGHT arrows to access the following readings, in order.)
•
Phase Angle Van/bn/cn
•
Phase Angle Ia/b/c
•
Phase Angle Vab/bc/ca
•
Phase Sequence
e
Electro Industries/GaugeTech
Doc # E151701
9-3
Summary of Contents for Nexus 1262
Page 1: ... The Leader in Power Monitoring and Control The Leader in Power Monitoring and Control ...
Page 2: ......
Page 4: ...Electro Industries GaugeTech Doc E151701 ...
Page 8: ...e Electro Industries GaugeTech Doc E151701 iv ...
Page 52: ...e Electro Industries GaugeTech Doc E151701 4 8 ...
Page 130: ...Electro Industries GaugeTech Doc E151701 10 14 ...
Page 133: ...Electro Industries GaugeTech Doc E151701 11 3 Fig 11 1 Form 9S Wye no PTs 3 CTs ...
Page 134: ...Fig 11 2 Form 9S Wye 3 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 4 ...
Page 135: ...Electro Industries GaugeTech Doc E151701 11 5 Fig 11 3 Form 9S 4 Wire Delta no PTs 3 CTs ...
Page 136: ...Fig 11 4 Form 9S 4 Wire Delta 3 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 6 ...
Page 139: ...Fig 11 7 Form 9S 3 Wire Delta no PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 9 ...
Page 140: ...Fig 11 8 Form 9S 3 Wire Delta 2 PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 10 ...
Page 141: ...Fig 11 9 Form 36S 2 5 Element Wye no PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 11 ...
Page 142: ...Fig 11 10 Form 36S 2 5 Element Wye 2 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 12 ...
Page 143: ...Fig 11 11 Form 45S Wye no PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 13 ...
Page 144: ...Fig 11 12 Form 45S Wye 2 PTs 3 CTs Electro Industries GaugeTech Doc E151701 11 14 ...
Page 145: ...Fig 11 13 Form 45S 3 Wire Delta no PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 15 ...
Page 146: ...Fig 11 14 Form 45S 3 Wire Delta 2 PTs 2 CTs Electro Industries GaugeTech Doc E151701 11 16 ...
Page 150: ...Electro Industries GaugeTech Doc E151701 11 20 ...
Page 154: ...Electro Industries GaugeTech Doc E151701 12 4 Fig 12 5 Switchboard Meter Side View ...
Page 168: ...Electro Industries GaugeTech Doc E151701 12 18 ...
Page 176: ...Electro Industries GaugeTech Doc E151701 13 8 ...
Page 186: ...Electro Industries GaugeTech Doc E151701 A 2 ...
Page 187: ...Electro Industries GaugeTech Doc E151701 A 3 ...
Page 188: ...Electro Industries GaugeTech Doc E151701 A 4 ...
Page 189: ...Electro Industries GaugeTech Doc E151701 A 5 ...
Page 190: ...Electro Industries GaugeTech Doc E151701 A 6 ...
Page 206: ...Electro Industries GaugeTech Doc E151701 C 14 ...