82
Using the Scheduler
You can set one scheduler setting for a project.
First, select a project, then access the SCHEDULER screen.
1
Press and hold the MENU button for more than 2 seconds to access the MAIN
MENU screen.
fig.main menu.eps
2
Select a project.
Click [SELECT] in the “PROJECT” area. When the SELECT PROJECT window
appears, select a project and click [OK].
fig.select project01.eps
The MAIN MENU screen reappears, and the selected project is shown to the left of
[SELECT].
For more information about projects, refer to
To cancel this operation, click [CANCEL]; the window goes away.
3
Click [SCHEDULER].
The SCHEDULER screen appears.
Preparations for setting a schedule
[SELECT]
[SCHEDULER]
Select a project.
[OK]
[CANCEL]
You can also click
[SCHEDULER] on the upper
right part in the MOVIE
EDITOR screen, to access the
SCHEDULER screen.
000RG-100.book 82 ページ 2004年8月6日 金曜日 午後5時37分