8
Before Installing Your ECO-matic...
Choosing the ‘CELL’ Location
The location in which the ‘Cell’ is to be installed is important. The ‘Cell’ must be located as follows:
* In the return-to-pool line (the pipe carrying filtered water back to the pool)
* AFTER (down-stream from) all other equipment (filter, heater etc)
* Locate the ‘Cell’ so t hat its power supply cord (attached to power supply ) can reach the ‘Cell ’
from the ‘Power Supply’ location.
* The ‘Cell’ cord must be at least 1.5 m (5 ft) distance from the in side walls of the pool/spa (at least
1.5m (5 ft) from the nearest water in the pool/spa).
Other considerations regarding ‘Cell’ location:
When correctly installed, the ‘Cell’ will produce sanitiz er only when water is flowing through it – and,
obviously, the sanitizer is carried in the water, to wherever the water is being directed
.
IMPORTANT: Refer to your ECO-matic Owner’s Guide for important instructions – how to
prevent over-production of sanitizer.
If there is a solar heater attached to the pool, locate the ‘Cell’ so that it has water flowing through it
whenever the filter pump is operating regardless of whether water is flowing through the solar heater
panels. Flow through each of the cells should be .09-.19 CBM (25-50 GPM) and plumbed to reduce
the potential for cavitation in the cell.
Dual Cells Installation
• Saltline USA recommends that a maximum of TWO cells be used per body of water
Summary of Contents for MEMS36USA
Page 12: ...12 offs on back of power supply provide ventilation for wall mounted units...
Page 15: ...15...
Page 16: ...16 Electrical Connection...
Page 31: ...30...