22
2021-09-21 | ECKOLD AG
Kraftformer KF 800
4. Transport / Set up
H
IMPORTANT
• Li
ft
the housing slightly with a forkli
ft
or a
crane for an easier centring of the screws.
4. Raise / lower the housing with a crane or forkli
ft
(4.1) until desired working height is reached.
Pay attention to the marking (4.2) (in alignment
with the edge of the housing substructure), so
that the mounting holes line up with the thread
again.
4.2
4.1
5. Reinstall 4 screws on each side of the housing
substructure and tighten them
fi
rmly. (with
Long-Arm Hex Key , size 14)
5
6. Reinstall the safety pro
fi
le
7. Relieve the li
ft
ing gear and revove it.
Summary of Contents for KRAFTFORMER KF 800
Page 48: ...48 2021 09 21 ECKOLD AG Kraftformer KF 800 8 Maintenance...
Page 52: ...52 2021 09 21 ECKOLD AG Kraftformer KF 800 9 Appendix 9 5 EC declaration of conformity...
Page 70: ...70 2021 09 21 ECKOLD AG Kraftformer KF 800 12 Pneumatikschema...
Page 71: ...71 2021 09 21 ECKOLD AG Kraftformer KF 800 Notizen Notes...
Page 72: ...FDR MAKERS SINCE 1957...