20
2021-09-21 | ECKOLD AG
Kraftformer KF 800
4. Transport / Set up
4.8
Unpacking / Setup of the machine
approx. 850 kg
Upon delivery the product is mounted on a shipping pallet.
1. Remove band and pins at the bottom edge of the box.
2. Remove the cover and the cardboard sleeve.
3. Hang the load hook in the li
ft
ing screw on the top side of the machine (without li
ft
ing the machine).
4. Remove the four
fi
xation nuts.
5. Li
ft
the machine out of the sledge, using the eyebolt (3) and set it down carefully on a level industrial
fl
oor.
No anchoring of the machine is necessary!
Make sure that the product does not turn when it is li
ft
ed!
Only use a crane with a rotating crane hook.
Clean the Kra
ft
former from possible soiling such as packing residue, dust, and the similar.
WARNING
—
Li
ft
ing the product with a forkli
ft
without su
ffi
cient carrying capacity
— Staying underneath the suspended product
—> If the product falls: Risk of death or injury to personnel, damage to the product
•
Only use a forkli
ft
with su
ffi
cient carrying capacity to li
ft
the product.
•
Do not hang around near or underneath the product during transportation.
•
Wear protective boots to protect your feet.
2
1
3
4
Summary of Contents for KRAFTFORMER KF 800
Page 48: ...48 2021 09 21 ECKOLD AG Kraftformer KF 800 8 Maintenance...
Page 52: ...52 2021 09 21 ECKOLD AG Kraftformer KF 800 9 Appendix 9 5 EC declaration of conformity...
Page 70: ...70 2021 09 21 ECKOLD AG Kraftformer KF 800 12 Pneumatikschema...
Page 71: ...71 2021 09 21 ECKOLD AG Kraftformer KF 800 Notizen Notes...
Page 72: ...FDR MAKERS SINCE 1957...