Controlling a Street Lighting Network with the Scheduler Application
Note
: To edit an event, click the event in the
Scheduler: Daily Schedules
Web page, change the
time or value, and then click
OK
. To delete an event, click the event in the
Scheduler: Daily
Schedules
Web page, right-click the event, click
Delete
on the shortcut menu, and then click
OK
.
8.
Repeat steps 1–6 to create events for other Daily Schedules in the Scheduler.
9.
Click
Submit
.
10.
Click
Back
to return to the
Scheduler: Configure
Web page.
Creating Exception Schedules
You can use the exception schedule to select a range of dates for which an exception occurs and
specify how frequently the exception recurs such as every weekday or weekend day. After you define
when and how often an exception occurs, you can create events for that exception.
Creating One-Time Exceptions
You can create a one-time exception to apply an alternate schedule for some period of time on a single
calendar date such as May 20, 2007 or December 21, 2008. In the case of a street lighting network,
you may need to create one-time exceptions to overlap multiple exceptions in order to create a single
solution that addresses all possible scenarios. To create a one-time exception, follow these steps:
1.
Click the Exception Schedules icon in the
Scheduler: Configure
Web page.
The
Scheduler: Exception Schedules
Web page opens.
2.
Right-click the date on which the one-time exception schedule is to be used, point to
Add
Exception
, and then click
New One-Time Exception
on the shortcut menu.
3.
The
New One-Time Exception
dialog opens.
Summary of Contents for i.LON SmartServer 2.0
Page 1: ...078 0348 01E i LON SmartServer 2 0 Power Line Repeating Guide...
Page 14: ...xiv Preface...
Page 50: ...36 Installing a Power Line Repeating Network...
Page 144: ...www echelon com...