6 XC-152 as a SmartWire-DT coordinator
6.1 SmartWire-DT operator control and display elements
Compact PLC XC-152
05/17 MN050001ZU EN www.eaton.com
59
6 XC-152 as a SmartWire-DT coordinator
Applies only to devices with a SmartWire-DT connection.
The starting point of an SmartWire-DT network is always an SmartWire-DT
coordinator.
XC-152-E... device models can take over this coordinator function as an
SWD- master interface.
In addition to the information in this document, you will also need the infor-
mation in the following SWD-documents in order to set up a SWD-network
and install and operate it as a SWD-coordinator.
Section "0.3 Documents with additional information”, page 6
The SmartWire-DT coordinator is where the SWD- network starts, and will
have a connection to the 8 pole SWD- ribbon cable used inside the control
panel in order to connect SWD modules. In addition to communication and
control wires, this SWD- ribbon cable also carries the supply voltages for con-
nected SWD- modules (15 VDC) and optionally used switchgear (24 VDC).
These two supply voltages are supplied through the XC-152-E... via connec-
tion terminals U
POW
and U
AUX
.
6.1 SmartWire-DT operator control and display elements
Figure 21:
SmartWire-DT connectors
①
②
③
④
⑤
⑥
⑦
⑨
⑧
power supply connection
SWD network
SWD- master interface
SWD ribbon cable connection