INSTALLATION
EATON
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 4
www.eaton.com/powerquality
26
Position 1
Position 6
Position 10
Position 15
First Rail
Second Rail
Figure 10. Front Rail Screw Positions for the EBM
3.
Secure the rail to the front of the rack with two hex-head screws (see Figure 11).
Front Rail Hex-Head Screws
Figure 11. Securing the Front Rail
Summary of Contents for Powerware Series
Page 1: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Page 2: ......
Page 3: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Page 84: ...OPERATION EATON BladeUPS 12 kVA User s Guide S 164201649 Rev 4www eaton com powerquality 76 ...
Page 119: ......
Page 120: ... 1642016494 164201649 4 ...