IL17574C
Page 3-10
Effective Date: 2/04
IQ 300
Page 3-10
Effective Date: 2/04
For more information visit:
www.cutler-hammer.eaton.com
H1A H1B H1C
LINE
L3
L2
L1
PS1 PS2
VA VB VC NEU
H2A H2B H2C
IQ 300
LOAD
3 Phase 4 W ire (Above 600Volts)
W YE
Connection
FUSE
FUSE
N
Control Power
IQ 320 IQ 330
90-600VAC
48-250VDC
IQ 310
110-240VAC
125-250VDC
Case Ground
Must be
connected for
proper operation
Proper CT polarity is critical to the proper operation of the meter
Figure 3.10 3 Phase 4 Wire Configuration (Above 600 Volts)
H1A H1B H1C
LINE
L3
L2
L1
PS1 PS2
VA VB VC NEU
H2A H2B H2C
IQ 300
LOAD
3 Phase 4 Wire (Up to 600Volts)
FUSE
N
Control Power
IQ 320/IQ 330
90-600VAC
48-250VDC
IQ 310
110-240VAC
125-250VDC
Case Ground
Must be
connected for
proper operation
Proper CT polarity is critical to the proper operation of the meter
Figure: 3.9 3 Phase 4 Wire Configuration (Up to 600 Volts)