Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07
51
44..1111
IInnssttaalllliinngg IInntteerrffaaccee C
Coonnnneeccttiioonnss
NOTE
If installing the IAC-D CT wiring, refer to the
Eaton 93PM Integrated Accessory Cabinet-
Distribution (50 kW, 100 kW, 150 kW, and 200 kW IAC-D) Installation and Operation
Manual
, listed in paragraph
, for installation instructions.
Use the procedures in the following paragraphs to connect the customer and battery interface connections.
44..1111..11 IInnssttaalllliinngg B
Buuiillddiinngg A
Allaarrm
m aanndd R
Reellaayy C
Coonnttaacctt C
Coonnnneeccttiioonnss
NOTE 1
If installing interface wiring connections between standalone cabinets or separate
devices, conduit must be installed between each cabinet or device.
NOTE 2
Disconnect terminal block plugs from terminal blocks to wire plugs.
To install wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See
, for shutdown instructions.
2.
If not already opened, open the front door by lifting the latch from the bottom and turning to the right
(counterclockwise) and swing the door open.
3.
If wiring the interface terminals from the bottom of the UPS, proceed to
Step 8
; otherwise, proceed to
Step 4
.
4.
Top Entry Wiring.
Remove the top interface entry conduit landing plates to drill or punch holes (see
).
5.
Reinstall the interface entry plates and install the conduit.
6.
Route the UPS building alarm and relay output interface wiring through the top interface entry conduit
landing plates to the UPS building alarm and relay output terminals. See
and
for UPS
interface terminal locations.
7.
Proceed to
Step 13
.
8.
Bottom Entry Wiring.
Remove the bottom interface entry conduit landing plates to drill or punch holes
(see
).
9.
Reinstall the interface entry plates and install the conduit.
10. Route the UPS building alarm and relay output interface wiring through the bottom interface entry conduit
landing plates to the bottom access interface wiring channel along the inside of the front door (see
).
11. Route the wiring along the interface wiring channel to the UPS building alarm and relay output terminals.
See
and
for UPS interface terminal locations.
12. Secure the wiring to the wire tie anchors provided (see
) using Zip ties.
13. Connect the building alarm interface wiring to the building alarm terminals. See paragraph
UPS System Interface Wiring Preparation
and
for wiring and termination requirements, and
for terminal assignments.
14. Connect the relay output interface wiring to the relay output terminals. See
for wiring and
termination requirements, and
for terminal assignments.
15. If wiring battery detect connections, proceed to paragraph
Installing Battery Detect Interface Connections
; if wiring battery shunt trip connections, proceed to
paragraph
Installing Battery Shunt Trip Interface Connections
; if wiring generator interface
connections, proceed to paragraph
Generator Interface Connections
; if wiring external parallel CAN
connections, proceed to paragraph
Installing External Parallel CAN Control Wiring and Connections