Eaton 93PM Integrated Accessory Cabinet-Distribution (50–200 kW) Installation and Operation Manual P-164000229—Rev 09
45
Figure 21. 480 VAC Input to IAC-D from UPS Terminal Detail – 208V/208V
Phase A
Phase C
Phase B
480 VAC Input to IAC-D
44..33..33
5500 kkW
W aanndd 110000 kkW
W O
Ouuttppuutt W
Wiirriinngg
To install wiring to connections:
1.
If not already open, open the front door (see
) by lifting the latch from the bottom and turning to
the right (counterclockwise) and swing the door open.
2.
Loosen the screws securing the inside distribution panel door and swing the door open.
3.
Loosen the screws securing the inside trim plate(s) and remove the plate(s). Retain trim plate(s) and
hardware for later use.
4.
If wiring an IAC-D with distribution panels, continue to
; if wiring an IAC-D with subfeed breakers or
an output breaker, skip to
5.
Install customer-supplied branch circuit breakers into the distribution panel (see
or
Use Cutler-Hammer bolt-on type BAB or QBHW breakers.
NOTE
When wiring branch circuits, begin adding conduits at the back of the bottom or top
conduit landing plates to simplify future circuit additions.
6.
Route output cables to the branch circuit breakers and wire the branch circuits according to the branch
circuit breaker manufacturer's ratings and instructions, and national and local electrical codes (input is
prewired to the panelboard). See
or
for neutral and ground terminal locations. See
paragraph
IAC-D Power Wiring Preparation
,
or
, and
for IAC-D wiring and
termination requirements.
7.
If wiring an IAC-D with subfeed breakers or an output breaker, continue to
; otherwise, skip to
NOTE
When wiring subfeed branch circuits, begin adding conduits at the back of the bottom or
top conduit landing plates to simplify future circuit additions.
8.
Route output cables from subfeed breaker terminal blocks or output breaker to the critical load. See
,
, or
for IAC-D output, neutral, and ground terminal locations. See paragraph
IAC-D Power Wiring Preparation
or
, and
for IAC-D wiring and termination
requirements.
9.
Connect Ground, phase A, B, and C, and Neutral power wiring to the subfeed breaker terminal blocks or
output breaker and the critical load.
For a detailed view of the IAC-D output terminals, see
, or