30
Eaton 93PM Integrated Accessory Cabinet-Distribution (50–200 kW) Installation and Operation Manual P-164000229—Rev 09
External 208 Vac input overcurrent protection and disconnect are not provided by the 208V/208V IAC-D model,
but are required by codes. Overcurrent protection and disconnect are to be supplied by the customer. Refer to
for wiring recommendations.
lists the recommended rating for the 208 Vac input circuit breaker. Maximum 50 kW 208V/208V IAC-D
input current is 174A and maximum 100 kW 208V/208V IAC-D input current is 347A.
Table 13. Recommended 208 Vac Input Circuit Breaker Rating
Input Rating
IAC-D Model
IAC-D
Rating
Load Rating
208V
Eaton 93PM 50 kW IAC-D
(208V/208V)
50 kW
80% Rated
225A
100% Rated
175A
Eaton 93PM 100 kW IAC-D
(208V/208V)
100 kW
80% Rated
450A
100% Rated
350A
CAUTION
To reduce the risk of fire, connect only to a circuit provided with maximum input circuit breaker current ratings
from
in accordance with the NEC, ANSI/NFPA 70.
33..33
IInnssppeeccttiinngg aanndd U
Unnppaacckkiinngg tthhee IIA
AC
C--D
D
The cabinet is shipped bolted to a wooden pallet and covered with outer protective packaging material (see
).
NOTE
Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified on the product's resources page
become void. See
for details. This service is offered as part of the
sales contract for the UPS. Contact an Eaton service representative in advance (a
minimum two-week notice is required) to reserve a preferred startup date.
WARNING
The IAC-D is heavy (see
). If unpacking and unloading instructions are not closely followed, the cabinet
may tip and cause serious injury or death.
1.
Carefully inspect the outer packaging for evidence of damage during transit.
CAUTION
Do not install a damaged cabinet. Report any damage to the carrier and contact an Eaton service representative
immediately.
NOTE
For the following step, verify that the forklift or pallet jack is rated to handle the weight
of the cabinet (see
).
2.
Use a forklift or pallet jack to move the packaged cabinet to the installation site, or as close as possible,
before unpacking. If possible, move the cabinet using the pallet. Insert the forklift or pallet jack forks
Summary of Contents for 93PM IAC-D