42
Eaton 93PM Integrated Accessory Cabinet-Distribution (50–200 kW) Installation and Operation Manual P-164000229—Rev 09
Refer to the applicable Eaton 93PM UPS manual, listed in paragraph
, for the UPS
terminal locations and termination requirements.
20. Connect the Ground and phase A, B, and C power wiring to the corresponding 480 VAC output terminals
on the IAC-D.
For a detailed view of the IAC-D 480 VAC output terminals, see
21. Connect the Ground and phase A, B, and C power wiring to the corresponding rectifier input terminals
on the UPS.
22. Route the 480 VAC output cables (phase A, B, and C and Ground) from the UPS through the bottom of the
cabinet to the IAC-D 480 VAC input terminals. See
for IAC-D terminal locations. See paragraph
IAC-D Power Wiring Preparation
, and
for IAC-D wiring and termination requirements.
Refer to the applicable Eaton 93PM UPS manual, listed in paragraph
, for the UPS
terminal locations and termination requirements.
23. Connect the Ground and phase A, B, and C power wiring to the corresponding 480 VAC input terminals
on the IAC-D.
For a detailed view of the IAC-D 480 VAC input terminals, see
24. Connect the Ground and phase A, B, and C power wiring to the corresponding output terminals on the
UPS.
25. Proceed to
.
26.
Top Entry Wiring.
Remove the top conduit plate (see
) from the top of the IAC-D. Identify all
conduit requirements (both input and output) and mark their location. Drill and punch all conduit holes in
the top conduit plate prior to mounting on the sidecar. Install the conduit plate and install all conduit runs
into the plate. Pull the wiring through the conduit into the wiring area.
27. Route the 208 VAC input cables (phase A, B, and C and Ground) from the utility source through the top of
the cabinet to the IAC-D 208 VAC utility source input terminals. See
for IAC-D terminal locations.
See paragraph
IAC-D Power Wiring Preparation
,
, and
for IAC-D wiring and termination
requirements.
28. Connect the Ground and phase A, B, and C power wiring to the corresponding 208 VAC utility source input
terminals on the IAC-D.
For a detailed view of the IAC-D utility source input terminals, see
29. Route the 480 VAC output cables (phase A, B, and C and Ground) from the IAC-D through the top of the
cabinet to the UPS rectifier input terminals. See
for IAC-D terminal locations. See paragraph
IAC-D Power Wiring Preparation
, and
for IAC-D wiring and termination requirements.
Refer to the applicable Eaton 93PM UPS manual, listed in paragraph
, for the UPS
terminal locations and termination requirements.
30. Connect the Ground and phase A, B, and C power wiring to the corresponding 480 VAC output terminals
on the IAC-D.
For a detailed view of the IAC-D 480 VAC output terminals, see
31. Connect the Ground and phase A, B, and C power wiring to the corresponding rectifier input terminals
on the UPS.
32. Route the 480 VAC output cables (phase A, B, and C and Ground) from the UPS through the top of the
cabinet to the IAC-D 480 VAC input terminals. See
for IAC-D terminal locations. See paragraph
IAC-D Power Wiring Preparation
, and
for IAC-D wiring and termination requirements.
Refer to the applicable Eaton 93PM UPS manual, listed in paragraph
, for the UPS
terminal locations and termination requirements.
33. Connect the Ground and phase A, B, and C power wiring to the corresponding 480 VAC input terminals
on the IAC-D.