background image

28

Eaton 93PM Integrated Accessory Cabinet-Distribution (50–200 kW) Installation and Operation Manual P-164000229—Rev 09

Table 10. External Critical Load Output Power Cable Terminations for the Eaton 93PM IAC-D

Terminal

Function

Breaker

Rating

Terminal

Function

Number and Size

of Pressure

Termination

(AWG or kcmil)

Tightening Torque

Nm (lb in)

Type and

Size Screw

AC Output

from Distribution

Panel

Breakers to Critical

Load

N/A

N

Neutral

64 – #6–#14

#6–#8:

#10–#14:

2.8 (25)
1.7 (15)

Slotted

22 – 1/0

#4–#6:

#8:

#10–#14:

5.0 (45)
4.5 (40)
4.0 (35)

N/A

G

Ground

32 – #6–#14

#6–#8:

#10–#14:

2.8 (25)
1.7 (15)

Slotted

11 – 1/0

#4–#6:

#8:

#10–#14:

5.0 (45)
4.5 (40)
4.0 (35)

AC Output from

Subfeed

Breaker Terminal

Block

to Critical Load

N/A

A

Phase A

1 – #6–500

20 (177)

1/2” Hex

B

Phase B

1 – #6–500

20 (177)

1/2” Hex

C

Phase C

1 – #6–500

20 (177)

1/2” Hex

N

Neutral

2 – #6–300

31 (275)

5/16” Hex

G

Ground

10 – #14–1/0

5.6 (50)

Slotted

AC Output from

Optional Single

Subfeed Breaker

Terminal Block

to Critical Load

(150 kW and

200 kW only)

N/A

A

Phase A

2 – #6–300

31 (275)

5/16” Hex

B

Phase B

2 – #6–300

31 (275)

5/16” Hex

C

Phase C

2 – #6–300

31 (275)

5/16” Hex

N

Neutral

2 – #6–300

31 (275)

5/16” Hex

G

Ground

2 – #14–1/0

5.6 (50)

Slotted

AC Output

from Output

Breaker

to Critical Load

“K” Frame

175A

(50 kW

IAC-D)

XOB-2

Phase A

1 – #3–350

31 (275)

5/16” Hex

XOB-4

Phase B

1 – #3–350

31 (275)

5/16” Hex

XOB-6

Phase C

1 – #3–350

31 (275)

5/16” Hex

N

Neutral

4 – #6–300

31 (275)

5/16” Hex

“LG” Frame

350A

(100 kW

IAC-D)

XOB-2

Phase A

2 – #2–500

42 (372)

5/16” Hex

XOB-4

Phase B

2 – #2–500

42 (372)

5/16” Hex

XOB-6

Phase C

2 – #2–500

42 (372)

5/16” Hex

N

Neutral

4 – #6–300

31 (275)

5/16” Hex

“LG” Frame

600A

(150 kW

IAC-D)

XOB-A

Phase A

4 – 2 bolt mounting

35 (310)

M12 Hex

XOB-B

Phase B

4 – 2 bolt mounting

35 (310)

M12 Hex

XOB-C

Phase C

4 – 2 bolt mounting

35 (310)

M12 Hex

N

Neutral

4 – 2 bolt mounting

35 (310)

M12 Hex

Installation Plan and Unpacking

Summary of Contents for 93PM IAC-D

Page 1: ...09 50 kW 480V 208V IAC D 50 kW 208V 208V IAC D 100 kW 480V 208V IAC D 100 kW 208V 208V IAC D 150 kW 480V 208V IAC D 200 kW 480V 208V IAC D Installation and Operation Manual Eaton 93PM Integrated Acces...

Page 2: ...produced in any way without the express written approval of Eaton IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS This manual contains important instructions that should be followed during insta...

Page 3: ...Wiring Preparation with Maintenance Bypass 22 3 3 Inspecting and Unpacking the IAC D 30 4 4 I In ns st ta alllla at tiio on n 3 33 3 4 1 Preliminary Installation Information 33 4 2 Unloading the IAC...

Page 4: ...fety Instructions 95 7 2 Performing Preventive Maintenance 95 7 2 1 DAILY Maintenance 95 7 2 2 PERIODIC Maintenance 95 7 2 3 ANNUAL Maintenance 95 7 3 Maintenance Training 96 8 8 P Pr ro od du uc ct t...

Page 5: ...igure 18 Input Power Terminal Locations 208V 208V 43 Figure 19 208 VAC Input to IAC D from Utility Source Terminal Detail 208V 208V 44 Figure 20 UPS Input Breaker Power Terminal Detail 208V 208V 44 Fi...

Page 6: ...oards 75 Figure 50 93PM IAC D 50 kW and 100 kW 480V 208V Schematic Top PRL1A Panelboard and Three 100 250A Adjustable Subfeed Breakers without Fans 76 Figure 51 93PM IAC D 100 kW 480V 208V Schematic T...

Page 7: ...mendations for the Eaton 93PM IAC D 480V 208V 24 Table 7 External Output Power Wiring Recommendations for the Eaton 93PM IAC D 208V 208V 25 Table 8 External Input Power Cable Terminations for the Eato...

Page 8: ...viii Eaton 93PM Integrated Accessory Cabinet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 List of Tables...

Page 9: ...208V models are available the 93PM 50 kW IAC D the 93PM 100 kW IAC D 93PM 150 kW IAC D and the 93PM 200 kW IAC D Two 208V 208V models are available the 93PM 50 kW IAC D and the 93PM 100 kW IAC D The I...

Page 10: ...ar Integrated Accessory Cabinet Bypass SIAC B or wall mount maintenance bypass One optional output distribution panel distributes the output power from the UPS to the load The distribution panel is be...

Page 11: ...Current Monitoring available at the UPS display Optional factory pre wiring to allow subfeed breakers to be field installed 150 kW features 480 208 Vac output transformer provides 208 Vac output from...

Page 12: ...panel and output breakers are made to easily accessible mechanical lug terminals on the breakers located at the front of the cabinet Subfeed breaker output connections are made to mechanical lug termi...

Page 13: ...istribution breaker One PRL1A 225A 42 pole distribution panel and one PRL1A 400A 42 pole branch distribution panel One PRL1A 225A 42 pole distribution panel one PRL1A 400A 42 pole branch distribution...

Page 14: ...allation and Operation Manual P 164000229 Rev 09 Figure 2 Eaton 93PM 50 kW 100 kW and 150 kW UPS with Left Mounted Eaton 93PM IAC D 93PM IAC D 93PM UPS Figure 3 Eaton 93PM 50 kW 100 kW and 150 kW UPS...

Page 15: ...50 200 kW Installation and Operation Manual P 164000229 Rev 09 7 Figure 4 Eaton 93PM 200 kW UPS with Left Mounted Eaton 93PM IAC D 93PM IAC D 93PM UPS Figure 5 Eaton 93PM 200 kW UPS with Right Mounte...

Page 16: ...K OF ELECTRIC SHOCK Observe the warning associated with the risk of electric shock symbol CAUTION REFER TO OPERATOR S MANUAL Refer to your operator s manual for additional information such as importan...

Page 17: ...mmunication capabilities of the UPS system Refer to the Eaton 93PM Sidecar Integrated Accessory Cabinet Bypass 100 kW SIAC B Installation and Operation Manual for the following additional information...

Page 18: ...200 kW Installation and Operation Manual P 164000229 Rev 09 1 1 9 9 E Eq qu uiip pm me en nt t R Re eg giis st tr ra at tiio on n Please visit www eaton com pq register to register your new Eaton UPS...

Page 19: ...Ambient temperature must not exceed 40 C 104 F Do not operate near water or excessive humidity 95 maximum The system is not intended for outdoor use As a result of the connected loads high leakage cu...

Page 20: ...12 Eaton 93PM Integrated Accessory Cabinet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 Safety Warnings...

Page 21: ...llustrations in this section to create a logical plan for installing the IAC D This section contains the following information Physical features and requirements including dimensions Power wiring inst...

Page 22: ...ciency 100 kW 208 480 input transformer 480 208 output transformer 5 62 19176 320 liter sec 678 cfm Eaton 93PM 150 kW IAC D with Standard K13 Output Transformer non TP1 efficiency 150 kW 480 208 2 98...

Page 23: ...the cabinet for top exhaust Rear exhaust see Figure 9 50 kW Natural convection air cooling regulates internal component temperature 100 kW Natural convection air cooling regulates internal component...

Page 24: ...208V 208V Zone 1 see Figure 10 or Figure 11 457 2 mm 18 minimum clearance for ventilation and working space From Top of Cabinet with rear service access Zone 2 see Figure 10 or Figure 11 Can be less t...

Page 25: ...ry Cabinet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 17 Figure 6 93PM IAC D Cabinet Dimensions Front Right Side and Back Views Dimensions are in millimeters inches In...

Page 26: ...inet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 Figure 7 93PM IAC D Dimensions Top and Bottom Views Dimensions are in millimeters inches NOTE Top exhaust configuration...

Page 27: ...Weight kg lb Eaton 93PM 50 kW IAC D 480V 208V 649 25 5 497 19 5 367 14 4 521 1149 Eaton 93PM 50 kW IAC D 208V 208V 854 33 6 443 17 4 392 15 4 698 1539 Eaton 93PM 100 kW IAC D 480V 208V 695 27 4 535 21...

Page 28: ...Cabinet Fans Back View 50 kW and 100 kW 208V 208V 150 kW and 200 kW 480V 208V 50 kW and 100 kW 50 kW 100 kW 150 kW and 200 kW 480V 208V 480V 208V 50 kW and 100 kW 208V 208V Figure 10 Cabinet Ventilat...

Page 29: ...al codes for acceptable external wiring practices For external wiring use copper wire with 75 C rated insulation Wire sizes listed in Table 4 through Table 7 are for copper wiring only If wire is run...

Page 30: ...all mount maintenance bypass NOTE The 208V 208V IAC D can be used only with a three breaker SIAC B or wall mount maintenance bypass The SIAC B maintenance bypass input E6 E7 E8 or wall mount maintenan...

Page 31: ...ses 1 Ground B Maximum Amps 75 150 Minimum Conductor Size Phase A B and C Number per Phase AWG or kcmil each 2 1 4 0 1 Minimum Conductor Size Ground Number AWG or kcmil each 8 1 6 1 480 VAC Input to I...

Page 32: ...5 Wire subfeed circuits in accordance with subfeed circuit breaker manufacturer s ratings selected trip rating and instructions power cable termination sizes listed in Table 10 and NFPA National Elect...

Page 33: ...ngs are to be in accordance with the rating label on the IAC D Maximum output ratings are to be in accordance with the rating label on the IAC D and national and local electrical codes The total combi...

Page 34: ...Eaton Figure 16 and Figure 17 show the 480V 208V IAC D input power terminal locations and detail Figure 18 and Figure 20 show the 208V 208V IAC D input output power terminal locations and detail Figu...

Page 35: ...ase B 2 6 300 31 275 5 16 Hex C Phase C 2 6 300 31 275 5 16 Hex 480 VAC Output to UPS from IAC D UPS Input Breaker 50 UIB 2 Phase A 1 14 1 0 5 6 50 5 16 Hex UIB 4 Phase B 1 14 1 0 5 6 50 5 16 Hex UIB...

Page 36: ...utral 2 6 300 31 275 5 16 Hex G Ground 10 14 1 0 5 6 50 Slotted AC Output from Optional Single Subfeed Breaker Terminal Block to Critical Load 150 kW and 200 kW only N A A Phase A 2 6 300 31 275 5 16...

Page 37: ...art Size Quantity Terminal Used On Bolt Hex Head Grade 5 M12 x 40mm 16 Phase and Neutral Output to Critical Load Washer Flat M12 32 Phase and Neutral Output to Critical Load Washer Conical Spring M12...

Page 38: ...A AC C D D The cabinet is shipped bolted to a wooden pallet and covered with outer protective packaging material see Figure 12 NOTE Startup and operational checks must be performed by an authorized Ea...

Page 39: ...let 4 Remove the protective packaging material from the cabinet and recycle in a responsible manner Retain the parts kit box packed inside the cabinet 5 Inspect the contents for any evidence of physic...

Page 40: ...n 93PM Integrated Accessory Cabinet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 Figure 12 Eaton 93PM IAC D as Shipped on Metal and Wood Pallet Installation Plan and Unp...

Page 41: ...follow these instructions may result in severe injury or death NOTE Before performing the IAC D unloading verify that the forklift or pallet jack is rated to handle the weight of the cabinet see Table...

Page 42: ...t Distribution Jacking Bolts 2 places front 2 places rear Floor Protectors 2 places front 2 places rear Cabinet Mounting Bolts 4 places front 4 places rear Front Support Cabinet Support Bolts 1 at eac...

Page 43: ...ting on the floor remove the jacking bolts and floor protectors Recycle them in a responsible manner 9 Remove the cabinet support bolts fastening the left right front and rear supports together see Fi...

Page 44: ...proceed to Step 21 otherwise continue to Step 24 21 Locate the front and back floor mounting brackets from the optional floor mounting kit 22 Using the cabinet mounting bolts from the kit install the...

Page 45: ...er rn na all P Po ow we er r W Wiir riin ng g If wiring a 480V 208V IAC D proceed to paragraph 4 3 1 Input Wiring 480V 208V if wiring a 208V 208V IAC D proceed to paragraph 4 3 2 Input Wiring 208V 20...

Page 46: ...conduit plate and install all conduit runs into the plate Pull the wiring through conduit into the wiring area 9 Route the output cables phase A B and C and Ground from the UPS through the bottom of t...

Page 47: ...164000229 Rev 09 39 Figure 16 Input Power Terminal Locations 480V 208V 480 VAC Input to IAC D from UPS A B C UPS Output Breaker Ground Terminals NOTE The IAC D is shown with top and bottom panelboard...

Page 48: ...tem is turned off and all power sources are removed See Chapter 6 Integrated Accessory Cabinet Distribution Operating Instructions for shutdown instructions 2 If not already open open the front door s...

Page 49: ...rom the UPS through the bottom UPS and IAC D inter cabinet wiring access pass through to the IAC D 480 VAC input terminals See Figure 18 for IAC D terminal locations See paragraph 3 2 2 IAC D Power Wi...

Page 50: ...onduit into the wiring area 27 Route the 208 VAC input cables phase A B and C and Ground from the utility source through the top of the cabinet to the IAC D 208 VAC utility source input terminals See...

Page 51: ...power wiring to the corresponding output terminals on the UPS 35 Proceed to paragraph 4 3 3 50 kW and 100 kW Output Wiring for 50 kW and 100 kW output wiring Figure 18 Input Power Terminal Locations...

Page 52: ...n Manual P 164000229 Rev 09 Figure 19 208 VAC Input to IAC D from Utility Source Terminal Detail 208V 208V Phase A Phase C Phase B 208 VAC Input to IAC D Figure 20 UPS Input Breaker Power Terminal Det...

Page 53: ...onduit landing plates to simplify future circuit additions 6 Route output cables to the branch circuit breakers and wire the branch circuits according to the branch circuit breaker manufacturer s rati...

Page 54: ...kers to adjust current trip settings otherwise proceed to Step 11 11 Reinstall the inside trim plate removed in Step 3 12 Close the inside door and secure with screws 13 Close the outside door and sec...

Page 55: ...n Panel Output Ground Terminals 480V 208V only PRL1A 225A 42 Pole Distribution Panel 480V 208V only Distribution Panel Output Neutral Terminals UPS Output Breaker 480V 208V IAC D or UPS Input Breaker...

Page 56: ...tion Panel Input Breaker Distribution Panel Output Ground Terminals PRL1A 225A 42 Pole Distribution Panel Distribution Panel Output Neutral Terminals UPS Output Breaker 480V 208V IAC D or UPS Input Br...

Page 57: ...om Subfeed Breaker Output Power Terminal Detail Subfeed Breaker 1 Output Terminal Block Subfeed Breaker 2 Output Terminal Block Subfeed Breaker 3 Output Terminal Block AC Output to Critical Load Phase...

Page 58: ...Output Ground Terminals Subfeed Breaker Output Neutral Terminals UPS Output Breaker 480V 208V IAC D or UPS Input Breaker 208V 208V IAC D JG Frame 100 250A Adjustable Subfeed Breakers 1 through 3 Subfe...

Page 59: ...Breaker 4 Output Terminal Block Subfeed Breaker 5 Output Terminal Block Subfeed Breaker 1 Output Terminal Block Subfeed Breaker 2 Output Terminal Block AC Output to Critical Load Phase A Phase B Phas...

Page 60: ...Manual P 164000229 Rev 09 Figure 27 Output Breaker Output Power Terminal Locations 50 kW and 100 kW Output Breaker Ground Terminals Output Breaker Neutral Terminals UPS Output Breaker 480V 208V IAC D...

Page 61: ...kW Output Wiring requires connecting the output breaker power wiring using 2 hole barrel lugs see Table 12 for recommended lugs See Figure 29 for the hardware sequence when installing the lugs to the...

Page 62: ...ck of the bottom or top conduit landing plates to simplify future circuit additions 6 Route output cables to the branch circuit breakers and wire the branch circuits according to the branch circuit br...

Page 63: ...l locations See paragraph 3 2 2 IAC D Power Wiring Preparation Table 6 and Table 10 for IAC D wiring and termination requirements 13 Using hardware from the external wiring terminal hardware kit Conne...

Page 64: ...t Neutral Terminals Distribution Panel Output Ground Terminals Distribution Panel Output Ground Terminals PRL1A 225A 42 Pole Distribution Panel PRL1A 225A or 400A 42 Pole Distribution Panel Optional S...

Page 65: ...inet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 57 Figure 31 Single Subfeed Breaker Output Power Terminal Detail 150 kW and 200 kW AC Output to Critical Load Phase A P...

Page 66: ...200 kW Installation and Operation Manual P 164000229 Rev 09 Figure 32 Output Breaker Output Power Terminal Locations 150 kW and 200 kW Output Breaker Ground Terminals Output Breaker Output Breaker Out...

Page 67: ...C D contain adjustable current trip settings The continuous current Ir values for the corresponding lettered adjustment setting marked on the subfeed breakers are listed in Table 14 To adjust breaker...

Page 68: ...arate conduit from the power wiring NOTE 3 Remove the IAC D conduit landing plates to drill or punch conduit holes or remove knockouts in the conduit plate see Figure 15 4 4 5 5 1 1 L Liin ne e U Up p...

Page 69: ...rs AMP 2 520183 2 or equivalent on the UPS end of the Neutral CT interface wiring 12 Proceed to Step 15 13 Top Entry Wiring Using blue white twisted pair 1 turn per 1 inch 22AWG Multi strand 600V 105C...

Page 70: ...Integrated Accessory Cabinet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 Figure 34 93PM IAC D Neutral CT Interface Terminal Location Neutral CT Interface Terminal Block...

Page 71: ...lue Wire TB 2 White Wire Table 15 IAC D Neutral CT Interface Wiring Terminal Block Terminations Terminal Name Description Recommended Wire Size Size of Pressure Termination Tightening Torque Comments...

Page 72: ...Accessory Cabinet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 Figure 36 50 kW UPS Neutral CT Interface Terminal Location Neutral CT Wire Faston Connectors located at t...

Page 73: ...inet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 65 Figure 37 100 kW and 150 kW Capacity UPS Neutral CT Interface Terminal Location Neutral CT Wire Faston Connectors lo...

Page 74: ...4 6 6 I In niit tiia all S St ta ar rt tu up p Startup and operational checks must be performed by an authorized Eaton Customer Service Engineer or the warranty terms specified on the product s resour...

Page 75: ...arting the UPS system for the first time 4 4 8 8 I In ns st ta alllla at tiio on n C Ch he ec ck klliis st t o All packing materials and restraints have been removed from each cabinet o The IAC D is i...

Page 76: ...____________________________________________ _________________________________________________________________________ _________________________________________________________________________ _______...

Page 77: ...nal structure of the Integrated Accessory Cabinet Distribution IAC D Figure 39 93PM IAC D 480V 208V Internal Oneline 50 kW 100 kW 150 kW and 200 kW with Two PRL1A Panelboards NOTE 50 kW model fans not...

Page 78: ...00 250A Adjustable Subfeed Breakers B B A B B NOTE 50 kW model fans not used 100 kW model fans optional 150 kW model fans installed 200 kW model fans installed Figure 42 93PM IAC D 480V 208V Internal...

Page 79: ...600A or 700A Output Breaker NOTE 50 kW model fans not used 100 kW model fans optional 150 kW model fans installed 200 kW model fans installed A B Figure 44 93PM IAC D 208V 208V Internal Oneline 50 kW...

Page 80: ...0 250A Adjustable Subfeed Breakers NOTE 50 kW and 100 kW 208V 208V models fans installed B D D D D A C D Figure 46 93PM IAC D 208V 208V Internal Oneline 50 kW with 175A Output Breaker or 100 kW with 3...

Page 81: ...inet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 73 Figure 47 93PM IAC D 50 kW and 100 kW 480V 208V Schematic Two PRL1A Panelboards without Fans 93PM IAC D 50 kW 93PM I...

Page 82: ...ated Accessory Cabinet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 Figure 48 93PM IAC D 100 kW 480V 208V Schematic Two PRL1A Panelboards with Fans 93PM IAC D 100 kW One...

Page 83: ...elboard N G T1 TRANSFORMER PRI 480V DELTA SEC 208 120Y WYE X3 X2 X1 H1 H2 H3 X0 DISTRIBUTION TIE BUS G G GND PMB2 400A BOTTOM 42 pole PRL1A Panelboard N G G TBG A B C GND UOB A B C TB N N N N N 225A 8...

Page 84: ...200 kW Installation and Operation Manual P 164000229 Rev 09 Figure 50 93PM IAC D 50 kW and 100 kW 480V 208V Schematic Top PRL1A Panelboard and Three 100 250A Adjustable Subfeed Breakers without Fans...

Page 85: ...tribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 77 Figure 51 93PM IAC D 100 kW 480V 208V Schematic Top PRL1A Panelboard and Three 100 250A Adjustable Subfeed Breakers with Fan...

Page 86: ...RI 480V DELTA SEC 208 120Y WYE X3 X2 X1 H1 H2 H3 X0 DISTRIBUTION TIE BUS G G GND TB N N N N N N N N N N N N N G G G G G G G TBG A B C A B C A B C A B C GND C A B Subfeed Terminal Block C A B C A B Sub...

Page 87: ...ibution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 79 Figure 53 93PM IAC D 50 kW and 100 kW 480V 208V Schematic Five 100 250A Adjustable Subfeed Breakers without Fans 93PM IAC D 50...

Page 88: ...sory Cabinet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 Figure 54 93PM IAC D 100 kW 480V 208V Schematic Five 100 250A Adjustable Subfeed Breakers with Fans 93PM IAC D...

Page 89: ...IONAL Subfeed 3 OPTIONAL Subfeed 4 OPTIONAL Subfeed 5 OPTIONAL N N N N N N N N N N N N G G G G G G G G G TBG TB N N N N N A B C A B C A B C A B C A B C A B C GND C A B C A B C A B C A B C A B Subfeed...

Page 90: ...inet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 Figure 56 93PM IAC D 50 kW or 100 kW 480V 208V Schematic 175A or 350A Output Breaker without Fans 93PM IAC D 50 kW 93PM...

Page 91: ...ed Accessory Cabinet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 83 Figure 57 93PM IAC D 100 kW 480V 208V Schematic 350A Output Breaker with Fans 93PM IAC D 100 kW Onel...

Page 92: ...ematic 600A or 700A Output Breaker T1 TRANSFORMER PRI 480V DELTA SEC 208 120Y WYE X3 X2 X1 H1 H2 H3 X0 DISTRIBUTION TIE BUS G G GND TB N N N N N TBG G G G A B C GND C A B XOB Terminal Block XOB FAN3 F...

Page 93: ...GROUND INTER CABINET STRAP TB N N N N N N N NEUTRALS FOR SUB FEEDS N N N N N N G G G G G G G TBG GROUNDS FOR SUB FEEDS GND Top Exhaust FAN3 FAN1 FAN2 A B C T2 AUTOTRANSFORMER PRI 208V WYE SEC 480V WY...

Page 94: ...G G G GROUNDS FOR SUB FEEDS G G G TBG TB N Top N N N N GND Top Exhaust FAN3 FAN1 FAN2 A B C T2 AUTOTRANSFORMER PRI 208V WYE SEC 480V WYE H3 H2 H1 X1 X2 X3 GND N N N A B C A B C A B C A B C A B C A B...

Page 95: ...1 H1 H2 H3 X0 DISTRIBUTION TIE BUS G G GND INPUT GROUND INTER CABINET STRAP TB N N NEUTRALS FOR XOB N TBG XOB 300A G G G LOAD GROUND A B C A B C GND Top Exhaust FAN3 FAN1 FAN2 N N N A B C N N N A B C...

Page 96: ...88 Eaton 93PM Integrated Accessory Cabinet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 Onelines and Schematics...

Page 97: ...put Breaker 208V 208V IAC D Controls the 480V input to the UPS from the IAC D Distribution Panel Input Breaker Controls input to the distribution panel Distribution Panel Provides up to 42 branch circ...

Page 98: ...ds Distribution Panel 1 Input Breaker 42 Pole Distribution Panel Distribution Panel 2 Input Breaker 480V 208V only 42 Pole Distribution Panel 480V 208V only UPS Output Breaker 480V 208V IAC D or UPS I...

Page 99: ...l Input Breaker 42 Pole Distribution Panel Subfeed Breaker 1 Subfeed Breaker 2 Subfeed Breaker 3 UPS Output Breaker 480V 208V IAC D or UPS Input Breaker 208V 208V IAC D NOTE The IAC D is shown with th...

Page 100: ...r 1 Subfeed Breaker 2 Subfeed Breaker 3 Subfeed Breaker 4 Subfeed Breaker 5 UPS Output Breaker 480V 208V IAC D or UPS Input Breaker 208V 208V IAC D NOTE The IAC D is shown with five 100 250A adjustabl...

Page 101: ...0 kW Installation and Operation Manual P 164000229 Rev 09 93 Figure 65 93PM IAC D Breakers Output Breaker UPS Output Breaker 480V 208V IAC D or UPS Input Breaker 208V 208V IAC D Output Breaker Integra...

Page 102: ...94 Eaton 93PM Integrated Accessory Cabinet Distribution 50 200 kW Installation and Operation Manual P 164000229 Rev 09 Integrated Accessory Cabinet Distribution Operating Instructions...

Page 103: ...re ev ve en nt tiiv ve e M Ma aiin nt te en na an nc ce e The UPS system requires very little preventive maintenance However the system should be inspected periodically to verify that the units are o...

Page 104: ...e en na an nc ce e T Tr ra aiin niin ng g A basic training course available from Eaton gives you a competent working knowledge of the UPS system operation and teaches you how to perform first level co...

Page 105: ...50 kW IAC D 208V 208V Eaton 93PM 100 kW IAC D 480V 208V IAC D for Eaton 93PM 100 kW UPS Frame Eaton 93PM 100 kW IAC D 208V 208V Eaton 93PM 150 kW IAC D 480V 208V IAC D for Eaton 93PM 150 kW UPS Capaci...

Page 106: ...aust Natural convection air cooling for top exhaust 50 kW with 208V 480V input transformer Forced air cooling for top exhaust Forced air cooling for rear exhaust 100 kW Natural convection air cooling...

Page 107: ...000229 Rev 09 99 C Ch ha ap pt te er r 9 9 W Wa ar rr ra an nt ty y For warranty information please refer to the Resources link on our website www eaton com 93PM EQUIPMENT REGISTRATION Please visit ww...

Page 108: ...P 16400022909 P 164000229 09...

Reviews: