commissioning, operation, care and continued maintenance of the Equipment. When
applicable, competent, qualified and/or, where mandated by Local Jurisdiction, Licensed
Electrical and/or Plumbing Contractors and Water Quality Service Providers may be
required to perform such installation and/or service procedures, as deemed necessary,
to assure the proper and safe installation, commissioning, operation, care and continued
maintenance of the Equipment.
4. Operation, care and continued maintenance of this Equipment should only be undertaken
by competent, qualified and, where mandated by Local Jurisdiction, Licensed Operating
Personnel who are, regularly engaged in such services, fully trained, and thoroughly
familiar, with same equipment, system application, ancillary support systems, and
accompanying Manuals and Procedures, provided with the Equipment to assure the
proper and safe commissioning, operation, care and continued maintenance of the
Equipment. When applicable, competent, qualified and/or, where mandated by Local
Jurisdiction, licensed Mechanical, Heating, HVAC, Electrical, Plumbing, Authorized Repair
Contractors and Water Quality Service Providers, may be required to perform such care
services and/or maintenance procedures, as deemed necessary, to assure the proper and
safe commissioning, operation, care and continued maintenance of the Equipment.
5. This Equipment must be installed in accordance with any, and all, applicable Codes and
Standards of the most current approved and/or accepted Editions, governing the design,
handling, installation, commissioning, operation, care and continued maintenance of
such equipment including those Codes and Standards and Specification requirements
which are mandated by Local Jurisdictions, and/or Utilities, having authority. Local
Jurisdictions, and/or Utilities, having authority should be consulted prior to installation
to assure applicable Codes and Standards compliance. Furthermore, those Manuals
and Procedures, as published by manufacturers of any and all component parts of this
Equipment, must be adhered to assure the proper and safe design, handling, installation,
commissioning, operation, care and continued maintenance of the Equipment and
component parts
Reference should be made, however shall not be limited in scope, to the following Codes,
Standards and Guidelines of the most current approved and/or accepted Editions , where
applicable, of, for the proper and safe design, handling, installation, commissioning,
operation, care and continued maintenance of the Equipment:
•
ASME B&PV Code Section I:
Rules for Construction of Power Boilers
• ASME B&PV Code Section IV:
Rules for Construction of Heating Boilers
• ASME B&PV Code Section VI:
Recommended Rules for the Care and Operation of Heating Boilers
• ASME B&PV Code Section VII:
Recommended Guidelines for the Care of Power Boilers
• ASME CSD-1:
Controls and Safety Devices for Automatically Fired Boilers
• NFPA 70:
National Electrical Code
• NFPA 31:
Installation of Oil Burning Equipment
• NFPA 54
: National Fuel Gas Code
• NFPA 211:
Standard for Chimneys, Fireplaces, Vents, and Solid Fuel Burning Appliances
• UL 795:
Standard for Commercial Industrial Gas Handling Equipment
• UL 726:
Standard for Oil Fired Boiler Assemblies