INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Easco Boiler Corp 1175 Leggett Ave Bronx, NY 1047 T: 718.378.3000 F: 718.378.4560 [email protected] easco.com
Page 3 of 46
CONTENTS
PREFACE AND STATEMENTS
2
IMPORTANT INFORMATION
5
SECTION 1: GENERAL
9
1.1
Introduction
9
1.2
Specification Requirements & Approvals
9
SECTION 2: REQUIREMENTS
10
2.1
Installation & Service Qualification
10
2.2
Operation, Care & Continued Maintenance Qualification
10
2.3
Codes, Standards, Local Jurisdictions Utilities
10
2.4
Warranty
11
SECTION 3: IDENTIFICATION AND CONFIGURATION
12
3.1
Manufacturer’s Data Plate
12
3.2
ASME Name Plate
12
3.3
Manufacturer’s Data Report
12
3.4
Configurations
13
SECTION 4: INSTALLATION INSTRUCTIONS
14
4.1
Inspection of Equipment Shipment
14
4.2
Placement Setting of Equipment
15
4.3
Flue Gas Venting Requirements
16
4.4
Combustion and Ventilation Air Supply
16
4.5
Equipment Field Connections
17
4.6
Operating Controls and Safety Devices
18
4.7
Fuel Burning and Handling Equipment
19
4.8
Domestic Hot Water Tankless Heater
19
4.9
Boil-Out Instructions
20
4.10
Cleaning a New Steam Boiler
23
4.11
Cleaning a New Hot Water Boiler
24
SECTION 5: OPERATION INSTRUCTIONS
26
5.1
BoilerOperation
26
5.2
Feed Water Connection
27
5.3
FiringApparatus
27
5.4
Pressure and Temperature Controls
27
5.5
Water Level Controls
28
5.6
Maintenance of Low Water Cut-Off Devices
28