Installation, Operation and Parts Manual
EE-62CE-60T
22
4.4 Items be checked after installation
S/N
Check items
YES
NO
1
Screw torque of expansion bolts : 80-100Nm;
√
2
Rising speed ≥20mm/s;
√
3
Noise with rated load ≤75dB(A);
√
4
Grounding resistance: not bigger than 4Ω;
√
5
Height difference of the two carriages ≤5mm;
√
6
Mechanical locks are robust and synchronized when running with rated load ;
√
7
If the control button works as “hold to run”?
√
8
If limit switches work well?
√
9
If grounding wire is connected?
√
10
If rising and lowering smoothly?
√
11
If there is no abnormal notice during running with rated load?
√
12
If there is no oil leakage when running with rated load?
√
13
If expansion bolts, nuts or circlips is well secured?
√
14
If the max lifting height is 1900mm?
√
15
If safety advices, name plate and logos are clear?
√
OPERATION INSTRUCTIONS
5.1 Precautions
5.1.1. Read and digest the complete operation instructions before operating the lift.
5.1.2. Only authorized persons are permitted to operate the lift.
5.1.3. Do not try to raise the vehicle with excessive length or width.
5.1.4. The space above and below the load as well as of the loading carrying devices shall be free of obstructions.
5.1.5. Position supporting pads to pick-up positions recommended by vehicle manufacturers.
5.1.6. Check the vehicle after raising a short distance to ensure that it is corrected and safely positioned.
5.1.7. The load carrying device shall be observed by the operator throughout the motion of the lift.
5.1.8. Engage the safety locking mechanism before entering under the raised vehicle.
5.1.9. Avoid excessive rocking of vehicle while on the lift
5.1.10. It is forbidden for people to stand in the field of motion during raising or lowering movement.
5.1.11. Do not climb onto the load or load carrying device when they are raised.