Installation, Operation and Parts Manual
EE-62CE-60T
15
Step 5: Erect and secure the post.
Screw Torque: 80-100N*m
1. Make the posts face to each other and the distance between the posts equals to the length of the overhead crossbeam. Use proper
means to erect the post.
2. Check the position of the base plates.
3. Drill the mounting holes. Remove the drilling dust from the hole.
4. Use a spirit level to check the vertical alignment of the posts. If necessary, place equalizing plates under the base plates. The equalizing
plates must be of the same length as the side of the base plate resting on them. Otherwise the load of the base plate will not be
transferred evenly to the foundation.
5. Erect and secure the other post similarly.
Step 6: Connect crossbeam.
Make the posts face to each other and the distance between the posts equals to the length of the overhead crossbeam.
1.Hex nut M14
2.Flat washer M14
3.Spring washer M14
4.Hex head full swivel screw M14*40
5.Crossbeam (out)
6.Crossbeam (in)
7.Hex socket cylinder head screw M6*30
8.Hex nut M6
9.Protective rod
10.Extending post