Installation, Operation and Parts Manual
EE-62CE-60T
16
Step 7: Connect the synchronization steel cables.
1. Route and fix according to the following diagram of steel cable connection.
2. Use suitable means to raise carriages at both sides to the first latching point. Ensure the both carriages are locked.
3. After the cable being fixed, adjust and make the cables at both sides be with the same tightness. Otherwise mechanical locking units at
both sides will be not able to lock synchronously. (This could be judged by the sound caused by mechanical safety locking system during
lifting process.)
4. Grease with NO.1 lithium grease (It is a must.)
Step 8: Connect the hydraulic lines.
1. Install hydraulic power unit onto the power side post.
1.Hex head full swivel screw M10*35
2.Anti-shock pad
3.Flat washer M10
4.Spring washer M10
5.Hex nut M10
6. Hydraulic power unit
7.Post
1. Steel cable A
2. Steel cable B