Installation, Operation and Parts Manual
EE-62CE-60T
14
4.3 General Installation Steps
ONLY TRAINED AND QUALIFIED INSTALLERS CAN PERFORM LIFT INSTALLATION DUTIES.
Step 1: Remove the packaging and take out the accessories attached.
Attention
:
The packs must be opened adopting all the precautions required to avoid injury to persons (keep at a safe distance when
cutting the straps) or damage to parts of the machine (be careful that no parts are dropped while you are opening the packing).
Use proper means (put something supporting under the post or suspend the post by a crane) to suspend the post, unscrew and
remove the bolts fixed on the iron rack.
Attention
:
Please pay special attention not to let the post fall down for it may cause casualty or bring damages to the accessories fixed in
the post.
Step 2: When the first post has been taken away, place something supporter under the second post and then remove the bolts on the
package.
Step 3: Connect extending posts.
1. Firstly have the extending post secured with the body post.
1.Hex nut M14
2.Flat washer M 14
3.Spring washer M14
4.Hex head full swivel screw M14*30
5.Extending post
Step 4: Fix the standing position for the two posts.
1. Unfold the package and decide on which post the power unit will be mounted.
2. Ascertain the position for the two posts with chalk and tape measure and draw an outline of the two base plates on the ground.
1. Hex bolt
2. Iron rack