Installation, Operation and Parts Manual
EE-62CE-60T
20
5. Connect wires come from motor and solenoid valve to the corresponding terminals in the control box.
Step 11: Install lifting arms.
The arm pin shafts (No. 2) must be greased at the installation
Install the lifting arms onto the carriages and ensure the arm lock could work.
Attention: Install Lifting arms and fix feet protection bars ONLY after the complete assembly has been erected and anchored.
Step 12: Fill with hydraulic oil.
CLEAN AND FRESH OIL ONLY. DON’T FILL THE TANK COMPLETELY FULL.
Lift must be fully lowered before changing or adding hydraulic oil.
Pour about
12
liters of anti-abrasion hydraulic oil into the oil tank. The level of oil shall reach the tippets volume mark of the tank.
Add more oil after running the lift for several cycles until the lift can rise to the maximum lifting height.
It is suggested to use HM NO.46 hydraulic oil. When average temperature of the location is below 10
℃
, use HM NO.32 hydraulic oil.
Change the oil 6 months after initial use and change once per year thereafter.
1. control box
2. Solenoid valve wire
3.Motor wire
4.Main power cable to be connected with external electricity supply
1.Swing lifting arm
2.Arm pin shaft
3.Fender for feet protection
4.Hex socket cap head screw M8x12