17
E-flite LR-1A Pogo 15e ARF Assembly Manual
14. Flex the rudder through its range of motion a
number of times to break in the hinges.
15. Insert the last hinge in position so it does not
get lost. Do not glue the hinge at this time.
Motor and Speed Control Installation
Required Parts
Fuselage assembly
Electronic speed control (ESC)
Motor (Power 15 or Power 25)
3mm x 10mm socket head bolt (4)
3mm x 18mm socket head bolt (4)
3mm lock washer (4)
Aluminum spacer, 5/16-inch (7mm) (4)
Required Tools and Adhesives
Threadlock
Hex wrench or ball driver: 2.5mm
Hook and loop tape
Phillips screwdriver: #1, #2
Always use threadlock on metal-to-metal fasteners
to prevent them from vibrating loose.
1. Use a #2 Phillips screwdriver to attach the
X-mount to the motor using the screws provided
with the motor.
2. Attach the motor to the firewall using four 3mm
x 10mm socket head screws and four 3mm lock
washers. Tighten the screws using a 2.5mm hex
wrench or ball driver.
Note
: When installing the Power 15 you will
be required to place the 5/16-inch (7mm)
aluminum spacers between the mount and
firewall and use the 3mm x 18mm socket head
bolts to provide the correct spacing for the
cowling.