13
E-flite LR-1A Pogo 15e ARF Assembly Manual
Steps 6 through 13 can be performed while
the epoxy is curing on the joiner wire.
6. Insert the joiner wire into both elevator halves.
Use low-tack tape to keep the joiner wire in
position while the epoxy cures. Use a straight edge
to make sure the elevator halves are in alignment
with each other.
7. Place a T-pin in the center of each of the four
hinges. This will center the hinges when installed in
the stabilizer.
8. Use a ruler to determine the center of the
stabilizer. Use a square and felt-tipped pen to mark
the center line on the top of the stabilizer. This will
help in aligning the stabilizer on the fuselage later.
9. Place the hinges in the stabilizer as shown.
10. Slide the elevators in position on the stabilizer.
11. Make sure the tips of the elevators are aligned
with the tips of the stabilizer.